Unit of competency Outline
Date retreived
22/07/2026 2:40 PM AWST
22/07/2026 2:40 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Install trench support
Install trench support
Unit of competency
National Code
RIICCM210D
RIICCM210D
State Code
WH086
WH086
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
040301 - Building Science And Technology
Original Release Date
29/05/2014
Nominal Hours
8
Description
This unit describes a participant’s skills and knowledge required to install trench support in Civil construction.This unit is appropriate for those working in operational roles.Licensing, legislative, regulatory and certification requirements that apply to this unit can vary between states, territories, and Industry sectors. Relevant information must be sourced prior to application of the unit.
Notes
Elements and Performance Criteria
1. Plan and prepare for installing trench support
- 1.1 Access, interpret and apply trench support documentation, and ensure the work activity is compliant
- 1.2 Obtain, read, interpret, clarify and confirm work requirements
- 1.3 Identify and address potential risks, hazards and environmental issues, and implement control measures
- 1.4 Select and wear personal protective equipment appropriate for work activities
- 1.5 Identify, obtain and implement traffic signage requirements
- 1.6 Select, and check for faults, equipment and/or attachments for work activities
- 1.7 Obtain and interpret emergency procedures, and be prepared for fire/accident/emergency
2. Install trench shoring
- 2.1 Communicate with plant operator and ensure the excavation of trenches complies with site plan, line and depth
- 2.2 Determine and prepare shoring method
- 2.3 Set out positioning of shoring
- 2.4 Position/erect shoring within the trench
- 2.5 Secure shoring in position and ensure structural conformity with regulations
- 2.6 Clean out excavation
- 2.7 Locate ladders for safe access and egress
3. Remove trench shoring
- 3.1 Release jacking mechanisms and remove ladders
- 3.2 Check shoring and prepare it for lifting from the trench
- 3.3 Remove shoring from trench and store it
4. Conduct housekeeping activities
- 4.1 Clear work area and dispose of or recycle materials
- 4.2 Clean and maintain condition of equipment, ensure suitability for use, and address/report issues
- 4.3 Manage/report hazards, and maintain a safe working environment
- 4.4 Process written records
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB570 | RIICCM210A | Install trench support | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCX36 | RIICCM210E | Install trench support | Unit of competency |