Unit of competency Outline
Date retreived
22/07/2026 1:52 PM AWST
22/07/2026 1:52 PM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Use SCADA systems in operations
Use SCADA systems in operations
Unit of competency
National Code
MSS402061A
MSS402061A
State Code
WD510
WD510
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
24/10/2014
Field of Education
030101 - Manufacturing Engineering
Original Release Date
24/10/2014
Nominal Hours
30
Description
This unit of competency covers the skills and knowledge required by an individual to interact with a System Control and Data Acquisition (SCADA) system as part of their job.
Notes
Elements and Performance Criteria
1 Use operator interface
- 1.1 Identify SCADA terminals relevant to own work station and functions
- 1.2 Use keyboards, track ball, monitor and/or stand alone controllers to access/interrogate system
- 1.3 Use correct level of access and find all relevant screens and information
- 1.4 Access message section and acknowledge messages
- 1.5 Input and output information correctly according to program and organisation requirements
2 Use information
- 2.1 Obtain data and information from SCADA, as required, including process, supply and product chain data
- 2.2 Interpret data and information as required by own job
- 2.3 Find and use relevant historical data and information
- 2.4 Use manufacturer manuals or specifications, as required, to expand knowledge of SCADA system relevant to own work
- 2.5 Determine and prioritise required actions
3 Make required changes in accordance with procedures
- 3.1 Adjust production/process in response to SCADA information
- 3.2 Record adjustments and variations to specifications/schedules and report to appropriate personnel
- 3.3 Seek feedback and information on adjustments to further improve procedures, where required
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as SCADA software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
SCADA
SCADA refers to:
a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information to personnel for action
In some industry sectors, the SCADA system is sometimes integrated into other sophisticated computer control systems, such as Distributed Control System (DCS). These sectors may simply refer to their SCADA as the DCS or other similar term (such as the proprietary name of the computer system).
SCADA systems may provide information from outside of the process, such as stock/material levels in a customer plant and/or available supply, supply rates and pricing from a supplier plant. This information may all be accessed by the SCADA system and the employee using it in order to make production rate and other control decisions (either automatically or human assisted) about their own operations and work processes
Supply and product chains
The supply chain Includes:
all suppliers in the chain from the initial raw material up to the current step in the operations process
The product chain includes:
all steps after the current step up to the final customer
Competitive systems and practices organisations encompass the entire production system, beginning with the customer, and includes:
the product sale
outlet
the final assembler
product design
raw material mining and processing
all tiers of the value stream (sometimes called the supply chain)
Any truly 'competitive' system is highly dependent on the demands of its customers and the reliability of its suppliers. No implementation of competitive systems and practices can reach its full potential without including the entire 'organisation' in its planning
Procedures
Procedures may include:
work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions and similar instructions provided for the smooth running of the plant
good operating practice as may be defined by industry codes of practice (e.g. good manufacturing practice (GMP) and responsible care)
government regulations
Procedures may be:
written, verbal, computer-based or in some other format
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as SCADA software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
SCADA
SCADA refers to:
a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information to personnel for action
In some industry sectors, the SCADA system is sometimes integrated into other sophisticated computer control systems, such as Distributed Control System (DCS). These sectors may simply refer to their SCADA as the DCS or other similar term (such as the proprietary name of the computer system).
SCADA systems may provide information from outside of the process, such as stock/material levels in a customer plant and/or available supply, supply rates and pricing from a supplier plant. This information may all be accessed by the SCADA system and the employee using it in order to make production rate and other control decisions (either automatically or human assisted) about their own operations and work processes
Supply and product chains
The supply chain Includes:
all suppliers in the chain from the initial raw material up to the current step in the operations process
The product chain includes:
all steps after the current step up to the final customer
Competitive systems and practices organisations encompass the entire production system, beginning with the customer, and includes:
the product sale
outlet
the final assembler
product design
raw material mining and processing
all tiers of the value stream (sometimes called the supply chain)
Any truly 'competitive' system is highly dependent on the demands of its customers and the reliability of its suppliers. No implementation of competitive systems and practices can reach its full potential without including the entire 'organisation' in its planning
Procedures
Procedures may include:
work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions and similar instructions provided for the smooth running of the plant
good operating practice as may be defined by industry codes of practice (e.g. good manufacturing practice (GMP) and responsible care)
government regulations
Procedures may be:
written, verbal, computer-based or in some other format
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
identify the scope and relevance of the SCADA system to their own work
access correct levels of the SCADA system
enter and retrieve data, including normal performance and variations
use SCADA system to assist in own work.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented ,or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
identify the scope and relevance of the SCADA system to their own work
access correct levels of the SCADA system
enter and retrieve data, including normal performance and variations
use SCADA system to assist in own work.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented ,or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8993 | MSACMT261A | Use SCADA systems in manufacturing | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAK41 | MSS402061 | Use SCADA systems in operations | Unit of competency |