Unit of competency Outline
Date retreived
22/07/2026 10:35 AM AWST
22/07/2026 10:35 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Handle construction materials
Handle construction materials
Unit of competency
National Code
CPCCCM2004A
CPCCCM2004A
State Code
W9373
W9373
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
20/06/2014
Field of Education
040301 - Building Science And Technology
Original Release Date
20/06/2014
Nominal Hours
16
Description
This unit of competency specifies the outcomes required to safely manually handle, store and apply environmental management principles associated with construction materials and components. It includes preparing material for mechanical handling.
Notes
Elements and Performance Criteria
1. Plan and prepare.
- 1.1. Work instructions and operational details are obtained, confirmed and applied from relevant information for planning and preparation.
- 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
- 1.3. Signage and barricade requirements are identified and implemented.
- 1.4. Tools and equipment selected to carry out tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
- 1.5. Material quantity requirements are calculated in accordance with plans and specifications.
- 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
- 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
2. Manually handle, sort, stack and store construction materials.
- 2.1. Construction materials are moved to specified location applying safe manual handling techniques.
- 2.2. Construction materials and components in accordance with job specifications are sorted to suit material type and size, and stacked for ease of identification and retrieval for task sequence and job location.
- 2.3. Construction materials and components are protected against physical and water damage and stored clear of access ways, for ease of identification, retrieval and distribution.
- 2.4. Signage and barricades are erected to isolate, protect and secure stored materials from workplace traffic or access.
- 2.5. Procedures are applied to ensure no cross-contamination of materials.
- 2.6. Hazardous materials are identified and separated.
- 2.7. Non-toxic materials are carried using correct handling procedures.
- 2.8. Dust suppression procedures are used to minimise health risk to work personnel and others.
- 2.9. Protection of material is provided in accordance with specific material needs.
3. Prepare for mechanical handling of materials.
- 3.1. Construction materials and components are stacked/banded for mechanical handling in accordance with the type of material, plant and equipment to be used.
- 3.2. Construction materials and components are loaded, unloaded, moved or located at specified locations.
4. Clean up.
- 4.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
- 4.2. Tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to handling construction materials
relevant Australian standards
safe work procedures related to handling construction materials
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Planning and preparation include:
work site inspection
equipment defect identification
assessment of conditions and hazards
determination of work requirements.
Safety (OHS) is to be in accordance with legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
banders
hammers
pallets
pinch bars
scaffolding
tin snips
wheelbarrows.
Materials:
include:
timber, reconstituted timber products and other building and sheet materials applicable to building and construction, bricks, bagged materials, sand, soil and aggregates
may include:
building elements such as roof trusses, lining materials, flooring materials, prefabricated elements, boxed, drummed and tinned materials, concrete masonry units, joinery units, floor and wall tiles, roofing tiles, steel sections/components, insulation and glass.
Environmental requirements include:
clean-up management
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Manual handling includes:
carrying materials using correct shifting techniques
control of waste
using pallets.
Preparing for manual handling includes:
forklifts
pallet jacks
trucks.
Hazardous materials include:
solvents, glues, coatings and inflammable materials
non-toxic materials, including general building and construction materials.
Handling procedures include:
MSDS, calculation of quantities, stacking and storing of materials
handling activities may require assistance of others where size or weight is a factor.
Dust suppression procedures include:
keeping dust in the air to a minimum.
Protection of material includes:
correct handling and stacking techniques without damaging the material
protecting with covers.
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to handling construction materials
relevant Australian standards
safe work procedures related to handling construction materials
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Planning and preparation include:
work site inspection
equipment defect identification
assessment of conditions and hazards
determination of work requirements.
Safety (OHS) is to be in accordance with legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
banders
hammers
pallets
pinch bars
scaffolding
tin snips
wheelbarrows.
Materials:
include:
timber, reconstituted timber products and other building and sheet materials applicable to building and construction, bricks, bagged materials, sand, soil and aggregates
may include:
building elements such as roof trusses, lining materials, flooring materials, prefabricated elements, boxed, drummed and tinned materials, concrete masonry units, joinery units, floor and wall tiles, roofing tiles, steel sections/components, insulation and glass.
Environmental requirements include:
clean-up management
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Manual handling includes:
carrying materials using correct shifting techniques
control of waste
using pallets.
Preparing for manual handling includes:
forklifts
pallet jacks
trucks.
Hazardous materials include:
solvents, glues, coatings and inflammable materials
non-toxic materials, including general building and construction materials.
Handling procedures include:
MSDS, calculation of quantities, stacking and storing of materials
handling activities may require assistance of others where size or weight is a factor.
Dust suppression procedures include:
keeping dust in the air to a minimum.
Protection of material includes:
correct handling and stacking techniques without damaging the material
protecting with covers.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
safely handle, sort and stack varying lengths of timber, providing quick access and use
safely move and stack a given quantity of sheet material
safely handle other building and construction components and materials for one construction project.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
safely handle, sort and stack varying lengths of timber, providing quick access and use
safely move and stack a given quantity of sheet material
safely handle other building and construction components and materials for one construction project.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W1816 | BCGCM2004B | Handle construction materials | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCO17 | CPCCCM2004 | Handle construction materials | Unit of competency |
| State Code | National Code | Title | Type |
|---|---|---|---|
| D381 | CPC10111 | Certificate I in Construction | Qualification |
| W568 | CPC10108 | Certificate I in Construction | Qualification |
| 1428 | 52292 | Course in Construction - SAL Family of Trades | Accredited course |
| J496 | CPC32912 | Certificate III in Construction Crane Operations | Qualification |
| D383 | CPC20211 | Certificate II in Construction Pathways | Qualification |
| W570 | CPC20208 | Certificate II in Construction Pathways | Qualification |
| D405 | CPC31611 | Certificate III in Paving | Qualification |
| J488 | CPC31712 | Certificate III in Post-Tensioning | Qualification |
| J489 | CPC31812 | Certificate III in Shopfitting | Qualification |
| D407 | CPC31811 | Certificate III in Shopfitting | Qualification |
| 1622 | 52259 | Certificate II in Signage (Pre-Apprenticeship) | Accredited course |
| BFB4 | NWP30219 | Certificate III in Water Industry Operations | Qualification |
| AYW7 | NWP30215 | Certificate III in Water Industry Operations | Qualification |