Unit of competency Outline

Date retreived
22/07/2026 1:36 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install telecommunications network equipment

Install telecommunications network equipment

Unit of competency
National Code
ICTTEN3056A
State Code
D3444
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
15/06/2010
State Implementation and Classification
Approved Date
15/04/2014
Field of Education
031309 - Communications Equipment Installation And Maintenance
Original Release Date
15/04/2014
Nominal Hours
80
Description
This unit describes the performance outcomes, skills and knowledge required to effectively install and test telecommunications network equipment. It includes processes for checking plans, obtaining and proper handling of equipment and supplies. No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement but users should confirm requirements with the relevant federal, state or territory authority.
Notes
Elements and Performance Criteria
1. Plan for installation of telecommunications network equipment
  • 1.1. Prepare for given work according to relevant occupational health and safety (OHS) and environmental requirements
  • 1.2. Notify customer to arrange site access if necessary
  • 1.3. Assess existing and potential site hazards
  • 1.4. Verify location of proposed network equipment installation according to the appropriate plans obtained from authorised personnel
  • 1.5. Develop installation plans to ensure minimal disruption to the workplace and according to relevant legislation, codes, regulations and standards
  • 1.6. Obtain tools and test equipment required for safe work practice
  • 1.7. Notify affected parties of possible network outage if required
2. Install network hardware and cabling
  • 2.1. Install network equipment according to the plan and manufacturer's instructions using safe industry practices
  • 2.2. Insert equipment cards and modules
  • 2.3. Install all interconnecting cables to specification
  • 2.4. Confirm service interruption is within limits agreed with the customer
  • 2.5. Document all installation drawings for the customer
3. Install equipment accessories
  • 3.1. Install alarms according to instruction manuals and to specification
  • 3.2. Install operations administration and maintenance system according to specification
  • 3.3. Install communication facilities for operational staff according to specification, taking into account any special needs of the site and the operational staff
  • 3.4. Install operator communication facilities according to needs and to specification
4. Configure and test the system
  • 4.1. Install software and configuration instructions according to system specifications if required
  • 4.2. Test to verify the system performance according to customer requirements
  • 4.3. Recommend any possible changes and confirm with customer
  • 4.4. Record all test results
5. Clean up worksite and complete documentation
  • 5.1. Remove and dispose of installation waste and debris from worksite according to environmental requirements
  • 5.2. Restore changes made to the work area during installation to the customer's satisfaction
  • 5.3. Complete all installation documents and present to the customer
  • 5.4. Declare asset ready for commissioning and integration
  • 5.5. Notify the customer and obtain signoff
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Relevant OHS and environmental requirements may relate to:
identifying other services including power and gas
need for decommissioning and isolate worksite and lines prior to commencement
personal protective clothing:
earmuffs
gloves:
plastic
rubber
leather
head protection
kneepads
masks
protective suits
safety boots
safety glasses
safety equipment:
flashing lights
gas and other hazard detection equipment
safety barriers
trench guards
warning signs and tapes
witches hats
safe working practices, such as the safe use and handling of:
asbestos
chemicals
materials
tools and equipment
work platforms
special access requirements
suitable light and ventilation
environmental considerations:
clean-up protection
stormwater protection
waste management.
Hazards may include:
building debris
earth potential rise (EPR)
glass fibre
live power lines
manual handling
mud and water
natural and other gas build up
needle stick injury
optical cable
radio frequency (RF) equipment emitting radiation
remote power feeding services
vermin.
Network equipment may include:
customer premises equipment (CPE) equipment:
cable/Pay TV
closed circuit TV (CCTV)
free to air TV
intercom
office equipment
security equipment
computer network:
gateways
network managers
router
servers
switches
voice over internet protocol (VoIP)
wireless LAN
multiplexing and radio:
fixed
mobile
optical equipment
RF
switching
transmission
voice switching units.
Authorised personnel may include:
consultant
contractor
network administrator
project manager.
Relevant legislation, codes, regulations and standards may include:
Australian Communications and Media Authority (ACMA) regulations relating to functional earthing
ACMA standards TS 14
AS Communications Cabling Manual (CCM) Volume 1
AS/NZS 3000:2007
AS/NZS 3080:2003
AS/NZS 3084:2003
AS/NZS 3085.1:2004
AS/NZS IEC 61935.1:2006
AS/NZS IEC 61935.2:2006
AS/NZS ISO/IEC 14763.3:2007
AS/NZS ISO/IEC 15018:2005
AS/NZS ISO/IEC 24702:2007
Australian Construction Industry Forum (ACIF) standards and codes
Australian standards applying to radiation hazards
AS/NZS/ISO 9001:2000
cabling security codes and regulations
environmental protection acts
heritage legislation
International Telecommunications Union (ITU) recommendations
OHS Acts
State/Territory and Federal environment Acts
technical standards AS/ACIF S008:2006 and AS/ACIF S009:2006.
Tools may include:
anti-static testers
cable strippers
cable testers
cable tie tensioners
crimpers
hammers
humidity and temperature testers
insulation displacement tools
jigsaws
level
load testers
mechanical lifts/hoists
pliers
power tools
screwdrivers
soldering irons
spanners
tape measures
tension wrenches
termination tools
trolleys
wire strippers.
Test equipment may include:
adaptors
analog transmission measuring sets
communication system analysers
digital analysers
error meter
frequency measurer
global system for mobile communication (GSM) spectrum frequency synthesiser
lap top computer
laser source
level meter
light meter
microwave link analyser
modulator tester
multimeters
optical attenuators
optical fibre power meters
oscillator
oscilloscopes
optical time domain reflectometer (OTDR)
pattern generators
power meters
RF band noise measurer
RF microwave test sets
RF sweep tester
spectrum analysers
sweep test coaxial and wave guide antenna systems
standing wave ratio (SWR) meters
transmitter/receiver filter combiner equipment
video tester.
Interconnecting cables may include:
communications cables:
Category 5 or 6
coaxial cable
data cables
jumper cables
optical patch cords
control cables
power cables
signal cables.
Test may include:
bit error rate (BER)
continuity
end to end
frequency response
functionality test
gain and attenuation
loop back
signal to noise ratio
speed.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the ability to:
plan and install network hardware and cabling according to equipment/system manuals and specifications
configure and test installation
verify cable continuity
comply with all related OHS requirements and work practices.
Context of and specific resources for assessment
Assessment must ensure:
sites where installation of telecommunications network equipment may be conducted
use of network testing equipment currently used in industry
relevant regulatory and equipment documentation that impact on telecommunications network equipment installation activities.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct observation of the candidate installing telecommunications network equipment
review of reports completed by the candidate for different scenarios and situations
oral or written questioning to assess knowledge of planning, types of systems.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
ICTSUS4184A Install and test power saving hardware
ICTTEN4051A Install configuration programs on PC based customer equipment
ICTTEN4198A Install, configure and test an internet protocol (IP) network
ICTTEN4199A Install, configure and test a router.

Aboriginal people and other people from a non-English speaking background may have second language issues.

Access must be provided to appropriate learning and assessment support when required.

Assessment processes and techniques must be culturally appropriate, and appropriate to the oral communication skill level, and language and literacy capacity of the candidate and the work being performed.

In all cases where practical assessment is used it will be combined with targeted questioning to assess required knowledge. Questioning techniques should not require language, literacy and numeracy skills beyond those required in this unit of competency.

Where applicable, physical resources should include equipment modified for people with special needs.
Replaces
State Code National Code Title Type
D2110 ICTTC056D Install telecommunications network equipment Unit of competency
Replaced By
State Code National Code Title Type
AWD56 ICTTEN302 Install telecommunications network equipment Unit of competency