Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Erect and dismantle basic scaffolding

Erect and dismantle basic scaffolding

Unit of competency
National Code
CPCCSC2002A
State Code
W9499
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
11/11/2010
State Implementation and Classification
Approved Date
26/03/2013
Field of Education
040329 - Scaffolding And Rigging
Original Release Date
26/03/2013
Nominal Hours
40
Description
This unit of competency specifies the outcomes required to erect and dismantle a range of modular scaffolding systems to provide work platforms for construction purposes.It includes edge protection, access ways and falsework (scaffold support systems for formwork).
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions, including plans, specifications, quality requirements and operational details are obtained from relevant information, confirmed and applied to the scope of work performed.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Plant, tools and equipment selected to carry out tasks are consistent with the requirements of the job, checked for serviceability and any faults or concerns regarding quality requirements are rectified or reported prior to commencement.
  • 1.5. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.6. Environmental requirements are identified for the project in accordance with environmental plans and statutory and legislative authority obligations and applied.
2. Whip, tie, splice and inspect ropes.
  • 2.1. Whipping cord and fibre rope are inspected for damage and wear.
  • 2.2. Designated rope ends are whipped in accordance with regulations and project specifications.
  • 2.3. Designated rope ends are spliced in accordance with regulations and project specifications.
  • 2.4. Bends and hitches are applied and inspected in accordance with project specifications.
3. Erect scaffolding.
  • 3.1. Purpose for scaffolding is confirmed and associated work tasks are identified.
  • 3.2. Expected loading on scaffold and supporting structure is determined using load tables and manufacturer specifications.
  • 3.3. Site access and egress routes are identified.
  • 3.4. Scaffolding and components are selected and inspected, and damaged components are labelled and rejected.
  • 3.5. Sole board/base plate is selected in accordance with regulations, legislation, codes of practice and manufacturer specifications.
  • 3.6. Scaffolding is set out and erected in accordance with regulatory and manufacturer requirements.
  • 3.7. Static lines are erected and installed where specified in accordance with regulatory requirements.
  • 3.8. Lifting device is assembled and erected where specified.
4. Inspect, repair and alter erected scaffolding.
  • 4.1. Erected modular scaffolding is inspected for damage, corrosion, wear and compatibility.
  • 4.2. Current use of scaffolding is checked against original design and is in accordance with regulations and specifications.
  • 4.3. Scaffolding stability is inspected and confirmed.
  • 4.4. Alteration or repair is carried out where specified.
  • 4.5. Inspection log and handover is completed and dated, ready for signing by a certified scaffolder.
5. Dismantle scaffolding.
  • 5.1. Scaffolding is isolated and appropriately signed and barricaded to ensure safe dismantling.
  • 5.2. Scaffolding is dismantled using reverse procedure as for erection.
6. Clean up.
  • 6.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 6.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions, where specified
MSDS
memos
regulatory and legislative requirements pertaining to erecting and dismantling modular scaffolding
relevant Australian standards
safe work procedures relating to erecting and dismantling modular scaffolding
signage
verbal, written and graphical instructions
work bulletins
work schedules, plans and specifications.
Scope of work:
planning and preparation includes work site inspection, equipment defect identification, assessment of conditions and hazards, and determination of work requirements
erection of scaffolding is to include placement, sequencing, squaring, levelling, tying to structure, and the reverse for dismantling
purposes of scaffolding include provision of work platforms, edge protection, access ways, falsework, grandstands and covered walkways
lifting devices include cantilevered hoists and gin wheels
establishment of footings includes review of JSA and safe work method statements to determine the bearing capacity of ground or working surfaces
whipping methods include common, west countryman, American and sail makers
splicing methods include end splice and eye splice
types of bends and hitches include clove hitch around a tube, rolling hitch around a tube, single bow line, timber hitch and half hitch around a plank, and sheet bend to another rope
alteration and repair may be required due to storm damage, accidents, misuse and process changes.
Safety (OHS) is to be in accordance with state and territory legislation and regulations and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling activities that may require the assistance of others or the use of manual or mechanical lifting devices where size, weight or other issues, such as a disability are a factor
hazard control
hazardous materials and substances, including cement and curing agents
organisational first aid
PPE prescribed under legislation, regulations and workplace policies and practices
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
working at heights
work site visitors and the public
working in confined spaces
working in proximity to others
use of firefighting equipment
use of tools and equipment
workplace environmental requirements and safety.
Tools and equipment:
include:
adjustable base plates
bends and hitches
box spanners
braces
bracket scaffolds (tank and formwork)
cantilevered hoists (materials only with maximum capacity of 500kg)
couplers and accessories
fibre ropes
guard rails
hammers
ledgers
mesh guards
mid rails
modular and prefabricated scaffolds
podgers hammers
prefabricated components
scaffold belts
scaffolding planks
spirit levels
stairs or ladders
standards
steel and aluminium tubes
tape measures
torpedo levels
transoms
wire nips
wrenches
may include:
gin wheels
safety nets
shovels
spanners
static lines.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications
workplace operations and procedures.
Environmental requirements include:
clean-up management
dust and noise
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering the applicable Acts, regulations and codes of practice.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply of relevant information, standards and specifications
comply with site safety plan and OHS legislation, regulations and codes of practice applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
complete whipping, splicing, tying and inspecting of five fibre ropes in accordance with regulations
complete planning, erection and dismantling of a modular scaffolding system, in accordance with JSA and safe work method statements and regulations, including a minimum of:
five bays with an internal and external return
four lifts, including ties
ladder and stair access
fall and edge protection.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1880 BCGSC2002B Erect and dismantle scaffolding - basic Unit of competency
Replaced By
State Code National Code Title Type
OCN56 CPCCSC2002 Erect and dismantle basic scaffolding Unit of competency