Unit of competency Outline
Date retreived
23/07/2026 12:22 AM AWST
23/07/2026 12:22 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Facilitate the use of SCADA systems in a team or work area
Facilitate the use of SCADA systems in a team or work area
Unit of competency
National Code
MSS404061A
MSS404061A
State Code
WD541
WD541
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
24/10/2014
Field of Education
030101 - Manufacturing Engineering
Original Release Date
24/10/2014
Nominal Hours
50
Description
This unit of competency covers the skills and knowledge required by a team leader or technical expert to personally use and facilitate the use of System Control and Data Acquisition (SCADA), or other similar systems, and support the team in their use of SCADA.
Notes
Elements and Performance Criteria
1 Identify scope of SCADA system
- 1.1 Identify categories of information held in and control options of SCADA system relevant to team or area
- 1.2 Identify range of information able to be provided to SCADA system by team
- 1.3 Identify range of information able to be provided to team by SCADA system
- 1.4 Identify team or area functions impacted by SCADA system
2 Communicate using SCADA system
- 2.1 Send and receive information using SCADA
- 2.2 Send and receive messages using SCADA
3 Make decisions using SCADA
- 3.1 Interrogate the SCADA system to find required current, historical or predicted information
- 3.2 Take actions appropriate to the information
4 Monitor the use of SCADA
- 4.1 Routinely monitor SCADA information
- 4.2 Identify poor uses of SCADA system within team and system inadequacies
- 4.3 Identify system improvements required
- 4.4 Take appropriate action to improve SCADA system and its use
5 Support team use of SCADA
- 5.1 Regularly communicate with team, both using SCADA-based communication and face to face
- 5.2 Identify skill improvement needs
- 5.3 Identify team members who require additional support
- 5.4 Take appropriate action to provide support
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
SCADA
SCADA is a general term applied to a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information personnel for action.
SCADA systems are often used in manufacturing but can also be used in other industries. In the continuous sector, the SCADA system is sometimes integrated into other sophisticated computer control systems, such as Distributed Control System (DCS) and these systems do merge in advanced systems. These organisations may simply refer to their SCADA as the DCS or other similar term (such as the proprietary name of the computer system)
Value stream
The value stream begins with the customer and includes all actions (both value-adding and non-value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/ collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
Just in Time (JIT), kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
SCADA
SCADA is a general term applied to a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information personnel for action.
SCADA systems are often used in manufacturing but can also be used in other industries. In the continuous sector, the SCADA system is sometimes integrated into other sophisticated computer control systems, such as Distributed Control System (DCS) and these systems do merge in advanced systems. These organisations may simply refer to their SCADA as the DCS or other similar term (such as the proprietary name of the computer system)
Value stream
The value stream begins with the customer and includes all actions (both value-adding and non-value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/ collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
identify team or area information and operations requirements and relate to SCADA system
lead and motivate others in using SCADA system
obtain regular and one-off information from SCADA system
make decisions using SCADA generated information.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess the underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
identify team or area information and operations requirements and relate to SCADA system
lead and motivate others in using SCADA system
obtain regular and one-off information from SCADA system
make decisions using SCADA generated information.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess the underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W9009 | MSACMT461A | Facilitate SCADA systems in a manufacturing team or work area | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAK10 | MSS404061 | Facilitate the use of SCADA systems in a team or work area | Unit of competency |