Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Establish and manage production requirements and resources

Establish and manage production requirements and resources

Unit of competency
National Code
CUETEM03C
State Code
D1608
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
29/10/2010
State Implementation and Classification
Approved Date
09/03/2012
Field of Education
080301 - Business Management
Original Release Date
09/03/2012
Nominal Hours
30
Description
This unit describes the skills and knowledge required to establish and manage resources and other requirements for a particular production area. It builds on the skills found in the unit CUETEM01C Coordinate production operations. No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement.
Notes
Elements and Performance Criteria
1. Establish production requirements
  • 1.1. Evaluate initial production concepts and technical requirements in relation to feasibility, safety and any environmental impact
  • 1.2. Provide timely, accurate and correct advice on the feasibility and safety of concepts and their implementation, including suggestions of workable alternatives as required
  • 1.3. Accurately document details of safety and technical requirements in relation to the production concepts
  • 1.4. Clarify production concepts and final requirements in consultation with the appropriate personnel as required
2. Complete plans for realisation of production requirements
  • 2.1. Identify and agree on options for realisation and execution in consultation with the appropriate personnel
  • 2.2. Correctly interpret production documentation/models to adapt these to serve practical requirements of construction or installation
  • 2.3. Accurately and appropriately document all decisions, agreements and other relevant information in accordance with organisational procedures
  • 2.4. Develop an action plan for implementing construction or installation incorporating all requirements in terms of labour, materials, equipment and facilities
3. Source and cost resources
  • 3.1. Source and cost resource requirements as required in accordance with organisation policy and procedures
  • 3.2. Develop realistic expenditure estimates to meet the budget allocation
  • 3.3. Identify potential budget overruns and resolve and/or recommend alternatives to appropriate personnel.
  • 3.4. Liaise with internal and/or external suppliers to acquire equipment and materials, using existing materials wherever possible
  • 3.5. Follow appropriate financial procedures in accordance with organisational policies and procedures
4. Manage construction or installation
  • 4.1. Organise and oversee work to ensure that construction or installation is completed within constraints of timeframes, budget and available technology
  • 4.2. Allocate tasks in accordance with skill, preference, training requirements and multi-skilling considerations
  • 4.3. Liaise with colleagues and attend appropriate run-throughs and/or production meetings to identify any alterations that need to be made to original design specifications
  • 4.4. Monitor construction or installation to ensure that it meets design specifications, budgetary constraints and timelines
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Production resources and requirements may relate to:
audio
audiovisual
lighting
props
scenic art
sets
special effects
stage management
Appropriate personnel may include:
designers
directors
production managers
other technical specialists
Production documentation/models may include:
designs
drawings
models
plans
production notes
script
Decisions on most appropriate implementation method/s may take account of factors, including:
budget constraints
time
venue
other company resource restrictions or safety considerations
Resource requirements may include:
equipment
facilities
labour
materials
Resources may be acquired through:
acquiring necessary licences and approvals, e.g. firearms licence
borrowing
contra-deals
hiring
purchasing
renting
Labour requirements may be for:
consultants/specialists
contract staff
permanent staff
Financial procedures may include:
establishing cheques and petty cash arrangements
establishing paperwork requirements, e.g. purchase orders, requisitions, record keeping, invoices quotes and estimates
implementing appropriate delegation and accountability arrangements








EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.

Overview of assessment

Critical aspects for assessment and evidence required to demonstrate competency in this unit
The following evidence is critical to the judgement of competence in this unit:
effective communication with artistic staff, senior management, peers and subordinates
ability to develop options for different production requirements and constraints
extensive knowledge of specialist area, particularly in the area of resource acquisition and management.

Context of and specific resources for assessment
The assessment context must provide for:
practical demonstration of skills through the establishment and management of technical requirements for more than one production or event
assessment conducted over a period of time to reflect the ongoing monitoring and implementation aspects of the unit
involvement of and interaction with a whole production team to reflect the collaborative nature of the skills in this unit.

Method of assessment
Assessment may incorporate a range of methods to assess performance and the application of essential underpinning knowledge, and might include:
evaluation of a particular technical aspect of and event or production for which the candidate has been responsible from planning to realisation
evaluation of reports prepared by the candidate analysing the processes undertaken to realise the technical aspects of a production and identifying key challenges and ways of overcoming those challenges
case studies to assess ability to develop technical approaches for different production situations
problem solving exercises to assess ability to generate solutions to a common range of challenges encountered
review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate.

Guidance information for assessment
Assessment of this unit requires access to:
venue where a production can be staged
equipment and materials relevant to the production area.


Replaces
State Code National Code Title Type
C7188 CUETEM03B Establish and manage production requirements and resources Unit of competency
Replaced By
State Code National Code Title Type
WI146 CUAPPM602 Manage construction workshop operations Unit of competency