Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Install lining, panelling and moulding

Install lining, panelling and moulding

Unit of competency
National Code
CPCCCA3013A
State Code
W9352
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
1.00
Current Release Date
19/05/2011
State Implementation and Classification
Approved Date
02/04/2014
Field of Education
040313 - Ceiling, Wall And Floor Fixing
Original Release Date
02/04/2014
Nominal Hours
24
Description
This unit of competency specifies the outcomes required to prepare, set out and install lining and panelling to either masonry or timber/metal framed walls. It includes the installation of mouldings to provide decorative finishes.
Notes
Elements and Performance Criteria
1. Plan and prepare.
  • 1.1. Work instructions, including plans, specifications, quality requirements and operational details, are obtained, confirmed and applied from relevant information for planning and preparation purposes.
  • 1.2. Safety (OHS) requirements are followed in accordance with safety plans and policies.
  • 1.3. Signage and barricade requirements are identified and implemented.
  • 1.4. Plant, tools and equipment selected to carry out lining and moulding installation tasks are consistent with job requirements, checked for serviceability, and any faults are rectified or reported prior to commencement.
  • 1.5. Material quantity requirements are calculated in accordance with plans, specifications and quality requirements.
  • 1.6. Materials appropriate to the work application are identified, obtained, prepared, safely handled and located ready for use.
  • 1.7. Environmental requirements are identified for the project in accordance with environmental plans and statutory and regulatory authority obligations, and are applied.
2. Prepare surface for lining/panelling.
  • 2.1. Fixing procedures for specified lining materials are selected in accordance with specifications.
  • 2.2. Surface is set out to provide a balanced panel or board effect to width and height.
3. Install lining/panelling.
  • 3.1. Lining material is marked, cut to length and/or shape, fitted and positioned to specifications.
  • 3.2. Panelling/lining is secured and fixed to job and manufacturer specifications.
  • 3.3. Panelling/lining is installed to plumb, level and uniform plane.
4. Cut and fix standard architrave mouldings.
  • 4.1. Standard architraves for edging are marked, cut to length, positioned and fitted to specifications.
  • 4.2. Skirtings are marked, cut to length, positioned and fitted to specifications.
  • 4.3. Mitre joints are fitted flush to face and true without gaps.
  • 4.4. Scribed joints are marked, cut to length, positioned and fitted to specifications.
  • 4.5. Scotia return end is cut to profile shape and length as detailed for location in drawings and specifications.
  • 4.6. Standard pelmet moulding sections are marked to length, cut, fitted and assembled and fixed to specifications with mitres true without gaps.
  • 4.7. Raked moulding is set out to position and mould is shaped to pattern for each position.
5. Clean up.
  • 5.1. Work area is cleared and materials disposed of, reused or recycled in accordance with legislation, regulations, codes of practice and job specification.
  • 5.2. Plant, tools and equipment are cleaned, checked, maintained and stored in accordance with manufacturer recommendations and standard work practices.
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Information includes:
diagrams or sketches
instructions issued by authorised organisational or external personnel
manufacturer specifications and instructions where specified
memos
MSDS
organisation work specifications and requirements
plans and specifications
regulatory and legislative requirements pertaining to installing lining, panelling and moulding
relevant Australian standards
safe work procedures related to installing lining, panelling and moulding
signage
verbal or written and graphical instructions
work bulletins
work schedules.
Planning and preparation include:
work site inspection
equipment defect identification
assessment of conditions and hazards
determination of work requirements.
Safety (OHS) is to be in accordance with state or territory legislation, regulations, codes of practice, organisational safety policies and procedures, and project safety plan and may include:
emergency procedures, including extinguishing fires, organisational first aid requirements and evacuation
handling of materials
hazard control
hazardous materials and substances
safe operating procedures, including the conduct of operational risk assessment and treatments associated with:
earth leakage boxes
lighting
power cables, including overhead service trays, cables and conduits
restricted access barriers
surrounding structures
traffic control
trip hazards
work site visitors and the public
working at heights
working in confined spaces
working in proximity to others
working with dangerous materials
organisational first aid
personal protective clothing and equipment prescribed under legislation, regulations and workplace policies and practices
use of firefighting equipment
use of tools and equipment
workplace environment and safety.
Tools and equipment include:
air compressors and hoses
bevels
chisels
coping saws
corking guns
cramps
hammers
hand planes
hand saws
marking equipment
measuring tapes and rules
moulding planes
nail guns
power drills
power leads
power planers
power saws
rebate planes
routers
saw stools
spirit levels
squares (combination/tri)
straight edges
string lines.
Lining of framed walling or battened surfaces provides a finished surface and includes:
all moulding applications where joining occurs at surface intersections and involves change of levels and mouldings running at a slope or rake.
junctions of surfaces, which may be at right angles or obtuse or acute angles
lining boards, which may be vertical, horizontal or raked.
Moulding includes:
beading (flat, quad, cover strips and nosings)
bull nosed
multi-curved
ornate period profile
Scotia
splayed
square.
Quality requirements include relevant regulations, including:
Australian standards
internal company quality policy and standards
manufacturer specifications, where specified
workplace operations and procedures.
Materials include:
lining, panelling, mouldings, nails, screws, adhesives and gap fillers
lining and panelling sheet materials, including lining boards, veneer panelling, plywood, hardboard, MDF board, particle board and fibre cement board.
Environmental requirements include:
clean-up protection
noise and dust
vibration
waste management.
Statutory and regulatory authorities include:
federal, state and local authorities administering applicable Acts, regulations and codes of practice.
Surfaces include:
floors, walls, ceilings, windows, door frames and jambs, built-in cupboards, built-in robes, fitments and stairs
preparation of surfaces may involve:
fixing of battens to surface
trimming of frame members to line
fixing of additional noggings
packing of frame members
wedging of frame members.
Architraves include:
may incorporate a plinth block.
Edging includes:
architrave
cornice
raking moulds
skirting.
Joints include:
butt or moulds (of plastic, metal or timber) incorporated in the joint or surface fixed above the joints.
EVIDENCE GUIDE
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
This unit of competency could be assessed in the workplace or a close simulation of the workplace environment, provided that simulated or project-based assessment techniques fully replicate construction workplace conditions, materials, activities, responsibilities and procedures.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
locate, interpret and apply relevant information, standards and specifications
comply with site safety plan, OHS regulations and state and territory legislation applicable to workplace operations
comply with organisational policies and procedures, including quality requirements
safely and effectively use tools, plant and equipment
communicate and work effectively and safely with others
complete lining one wall to a minimum of 3 metres by 2.4 metres, with lining boards including one opening to specifications
complete lining one wall to a minimum of 3 metres by 2.4 metres, with sheet panelling including one opening to specifications
complete fitting profiled architraves to a minimum of one door or one window or a combination of both, with specified margins and tight fitting mitre joints
complete cutting and fixing a profiled skirting with a minimum of one internal scribed joint and one external mitre joint with tight fitting joints
complete scribing and mitring a Scotia, quad and colonial architrave with a minimum of one internal joint and one external mitre joint with tight fitting joints
construct a pelmet with two return ends able to be fixed and removed upon completion
construct a raking mould using either an internal scribed or external mitre joint with tight fitting joints.
Context of and specific resources for assessment
This competency is to be assessed using standard and authorised work practices, safety requirements and environmental constraints.
Assessment of essential underpinning knowledge will usually be conducted in an off-site context.
Assessment is to comply with relevant regulatory or Australian standards' requirements.
Resource implications for assessment include:
an induction procedure and requirement
realistic tasks or simulated tasks covering the mandatory task requirements
relevant specifications and work instructions
tools and equipment appropriate to applying safe work practices
support materials appropriate to activity
workplace instructions relating to safe work practices and addressing hazards and emergencies
material safety data sheets
research resources, including industry related systems information.
Reasonable adjustments for people with disabilities must be made to assessment processes where required. This could include access to modified equipment and other physical resources, and the provision of appropriate assessment support.
Method of assessment
Assessment methods must:
satisfy the endorsed Assessment Guidelines of the Construction, Plumbing and Services Training Package
include direct observation of tasks in real or simulated work conditions, with questioning to confirm the ability to consistently identify and correctly interpret the essential underpinning knowledge required for practical application
reinforce the integration of employability skills with workplace tasks and job roles
confirm that competency is verified and able to be transferred to other circumstances and environments.
Validity and sufficiency of evidence requires that:
competency will need to be demonstrated over a period of time reflecting the scope of the role and the practical requirements of the workplace
where the assessment is part of a structured learning experience the evidence collected must relate to a number of performances assessed at different points in time and separated by further learning and practice, with a decision on competency only taken at the point when the assessor has complete confidence in the person's demonstrated ability and applied knowledge
all assessment that is part of a structured learning experience must include a combination of direct, indirect and supplementary evidence.
Assessment processes and techniques should as far as is practical take into account the language, literacy and numeracy capacity of the candidate in relation to the competency being assessed.
Supplementary evidence of competency may be obtained from relevant authenticated documentation from third parties, such as existing supervisors, team leaders or specialist training staff.
Replaces
State Code National Code Title Type
W1798 BCGCA3013B Install lining, panelling and moulding Unit of competency
Replaced By
State Code National Code Title Type
BBA98 CPCCSH3008 Install internal shop walls and fixtures Unit of competency