Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Operate a production unit

Operate a production unit

Unit of competency
National Code
PMAOPS300B
State Code
W8864
TGA Status
Replaced
DTWD Status
Replaced
Current Release Number
2.00
Current Release Date
24/06/2013
State Implementation and Classification
Approved Date
18/12/2008
Field of Education
030717 - Plant And Machine Operations
Original Release Date
18/12/2008
Nominal Hours
40
Description
This competency covers the operation of an enterprise specific unit of a production plant, which is not otherwise described by other units in this Training Package. The operations technician is expected to demonstrate a significant understanding of the process and the equipment operation. The plant unit includes the operation of other plant items which are integral to the operation of the plant unit.
Notes
Elements and Performance Criteria
1 Prepare for work
  • 1.1 Identify work requirements
  • 1.2 Identify and control hazards
  • 1.3 Coordinate with appropriate personnel
2 Start up unit
  • 2.1 Perform pre-start-up checks
  • 2.2 Start up individual items of equipment and the entire unit
  • 2.3 Start up normally and after maintenance
  • 2.4 Build rate steadily
  • 2.5 Stabilise operation to produce specified rate and quality within minimum time
3 Monitor and control the unit
  • 3.1 Complete routine checks, logs and paperwork
  • 3.2 Frequently and critically monitor all plant throughout shift
  • 3.3 Recognise the signs of potential and actual problems
  • 3.4 Take appropriate action
  • 3.5 Trim plant to achieve required output rate and quality while maximising plant efficiency
4 Change unit output rate, grade or specification
  • 4.1 Predict the need to make a change to meet process requirements
  • 4.2 Trim unit in preparation of changes
  • 4.3 Make changes as required
  • 4.4 Manage changes smoothly and in a timely manner
  • 4.5 Minimise out of specification product/process disruptions as a result of the change
5 Maintain plant effectiveness
  • 5.1 Use measured/indicated data and smell, sight, sound and feel as appropriate to monitor plant
  • 5.2 Identify critical equipment/processes and tune their performance
  • 5.3 Identify issues likely to impact on plant performance and take appropriate action
  • 5.4 Predict impact of a change in one unit/area on other plant units/areas and communicate this to relevant people
  • 5.5 Test trips and alarms as required
  • 5.6 Complete minor maintenance according to procedures
6 Shut down unit
  • 6.1 Determine type of shut down required
  • 6.2 Give advance warning of shut down where possible
  • 6.3 Change over individual items of equipment
  • 6.4 Shut down individual items of equipment and the entire unit
  • 6.5 Shut down to a standby condition if appropriate
  • 6.6 Shut down in an emergency and otherwise when required
  • 6.7 Reset trips and alarms after a shutdown
7 Isolate and de-isolate plant
  • 7.1 Isolate plant
  • 7.2 Make safe for required work
  • 7.3 Check plant is ready to be returned to service
  • 7.4 Prepare plant for return to service
The Range Statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the Performance Criteria, is detailed below. Add any essential operating conditions that may be present with training and assessment depending on the work situation, needs if the candidate, accessibility of the item, and local industry and regional contexts.
Codes of practice/ standards
Where reference is made to industry codes of practice, and/or Australian/international standards, the latest version must be used.
Context
This competency covers the operation of a unit of equipment and includes the operation of equipment ancillary to the main production unit. It includes all items of equipment and unit operations which form part of the operation of the unit.
Problems
Typical problems include:
recognising and acting on unstable/sub-optimal operation
control of critical variables and outputs
variations in feed rates, quality, and so on
Start up shut down as required
Start up shut down as required includes:
start up and shut down to/from normal operating conditions
start up and shut down to/from isolated, cold or empty
all other conditions experienced on the plant (i.e. from any condition to any condition experienced on the plant)
Appropriate action
Appropriate action includes:
determining problems needing action
determining possible fault causes
rectifying problem using appropriate solution within area of responsibility
following through items initiated until final resolution has occurred
reporting problems outside area of responsibility to designated person
Procedures
Procedures may be written, verbal, computer-based or in some other form. They include:
all work instructions
standard operating procedures
formulas/recipes
batch sheets
temporary instructions
any similar instructions provided for the smooth running of the plant
For the purposes of this Training Package, 'procedures' also includes good operating practice as may be defined by industry codes of practice (e.g. Responsible Care) and government regulations.
Health, safety and environment (HSE)
All operations to which this unit applies are subject to stringent HSE requirements, which may be imposed through state or federal legislation, and these must not be compromised at any time. Where there is an apparent conflict between Performance Criteria and HSE requirements, the HSE requirements take precedence.
Product
Product includes anything produced by a process step and so includes intermediate products, such as the product from one process step which then becomes the feed for another’.
The Evidence Guide provides advice on assessment and must be read in conjunction with the Performance Criteria, Required Skills and Knowledge, the Range Statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Assessment of this unit should include demonstrated competence on actual plant and equipment in a work environment. The unit will be assessed in as holistic a manner as is practical and may be integrated with the assessment of other relevant units of competency. Assessment will occur over a range of situations which will include disruptions to normal, smooth operation.
Simulation may be required to allow for assessment of parts of this unit. Simulation should be based on the actual plant and will include walk-throughs of the relevant competency components. Simulations may also include the use of case studies/scenarios and role plays.
This unit of competency requires a significant body of knowledge which will be assessed through questioning and the use of what-if scenarios both on the plant (during demonstration of normal operations and walk-throughs of abnormal operations) and off the plant.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Competence must be demonstrated in the ability to recognise and analyse potential situations requiring action and then in implementing appropriate corrective action. The emphasis should be on the ability to stay out of trouble rather than on recovery from a disaster.
Consistent performance should be demonstrated. In particular look to see that:
early warning signs of equipment/processes needing attention or with potential problems are recognised
the range of possible causes can be identified and analysed and the most likely cause determined
appropriate action is taken to ensure a timely return to full performance
obvious problems in related plant areas are recognised and an appropriate contribution made to their solution.
These aspects may be best assessed using a range of scenarios/case studies/what-ifs as the stimulus with a walk-through forming part of the response. These assessment activities should include a range of problems, including new, unusual and improbable situations which may have been generated from the past incident history of the plant, incidents on similar plants around the world, hazard analysis activities and similar sources.
Context of and specific resources for assessment
Assessment will require access to an operating plant over an extended period of time, or a suitable method of gathering evidence of operating ability over a range of situations. A bank of scenarios/case studies/what-ifs will be required as will a bank of questions which will be used to probe the reasoning behind the observable actions.
Method of assessment
In all plants it may be appropriate to assess this unit concurrently with relevant teamwork and communication units.
In a major hazard facility, it may be appropriate to assess this unit concurrently with:
MSAPMOHS200A Work safely.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the assessee and the work being performed.
Replaces
State Code National Code Title Type
C5961 PMAOPS300A Operate a production unit Unit of competency
Replaced By
State Code National Code Title Type
AXN17 PMAOPS300 Operate a production unit Unit of competency