Unit of competency Outline

Date retreived
22/07/2026 8:10 PM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Prepare, load and unload product on and off machine

Prepare, load and unload product on and off machine

Unit of competency
National Code
ICPSUP202
State Code
AUM65
TGA Status
Replaced
DTWD Status
Transition (Replaced)
Current Release Number
1.00
Current Release Date
26/03/2015
State Implementation and Classification
Approved Date
16/09/2015
Field of Education
030103 - Printing
Original Release Date
16/09/2015
Nominal Hours
20
Description
This unit describes the skills and knowledge required to prepare, load and unload product on and off machines according to work health and safety (WHS) requirements and manufacturer/supplier’s specifications with minimum downtime.This unit applies to individuals who provide production, corrugating and mail house support across various sectors of the printing and graphic arts industry. They use limited practical skills and fundamental knowledge in a defined context, and generally work under direct supervision.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare product
  • 1.1 Job sheets or equivalent are interpreted correctly
  • 1.2 Product is located and prepared to meet job specifications
  • 1.3 Product is positioned correctly on the machine to meet job specifications
  • 1.4 Faulty product is visually identified and removed according to WHS requirements and enterprise procedures
2. Load product onto machine
  • 2.1 Product is loaded according to WHS requirements and manufacturer’s and enterprise procedures and specifications
  • 2.2 Area around machine is cleaned during and on completion of loading
3. Unload product off machine
  • 3.1 Product is unloaded according to WHS requirements and manufacturer’s and enterprise procedures and specifications
  • 3.2 Product is prepared (hand-stripped, stacked, wrapped, labelled) for next process according to manufacturer’s and enterprise procedures and specifications
  • 3.3 Product is stored according to manufacturer’s and enterprise procedures and specifications
No information
No information
Replaces
State Code National Code Title Type
D3241 ICPSU202C Prepare, load and unload product on and off machine Unit of competency
Replaced By
State Code National Code Title Type
OBQ64 ICPSUP2020 Prepare, load and unload product on and off machine Unit of competency