Accredited course Outline

Date retreived
22/07/2026 5:20 AM AWST

Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.

Certificate III in General Plumbing And Gasfitting

Certificate III in General Plumbing And Gasfitting

Accredited course
National Code:
51059
State Code:
1412
TGA Status:
Draft
DTWD Status:
Approved
State Implementation and Classification
Approved Date
05/06/2002
Field of Education
040327 - Plumbing
AQF Level
Certificate III in
Nominal Hours
880
Duration
Unspecified
Stream of Study
Initial Vocational (3100 - 3600)
Accredited Date
05/06/2002
Expiry Date
30/01/2006
VET Act Classifier
A
VET Act Conditions
Description

To provide foundation studies in the Plumbing and Gasfitting trades.

To provide the theoretical basis and the development of skills and safe working practices commonly found in the Plumbing and Gasfitting trade, supplementary to employer-provided work practice and on-the-job experience in the industry.

To prepare students to meet the requirements of the Australia/NZ Reciprocity Association agreement. (This is an agreement between all States of Australia and New Zealand, Britain and other overseas countries
in relation to recognition of qualifications of plumbers at:

-journeyman operative level, and
-advanced plumbing levels.

Schedule
1.

GENERIC STRUCTURE
These units are mandatory

State Code National Code Title Hours Type
N0827 Carry Out Interactive Workplace Communication 16 Module
N0828 Carry Out OH&S Requirements 16 Module
N0084 BCG1007A Erect and dismantle restricted height scaffolding 16 Unit of competency
N0830 Handle Construction Materials and Safe Disposal of Waste 16 Module
N0090 BCG2007A Operate elevating work platforms (EWP) 8 Unit of competency
N0829 Read Plans and Calculate Quantities 16 Module
2.

PLUMBING
These units are mandatory

State Code National Code Title Hours Type
N0648 Apply First Aid in the Workplace (Part 1 of 2 N0608) 15 Module
N0608 Apply First Aid in the Workplace (Part 2 of 2 N0608) 15 Module
N0562 BCS3021A Carry Out Levelling 12 Module
N0563 BCS3022A Carry Out Simple Forms of Concreting Associated With Plumbing Work 6 Module
W0002 Construct On site Disposal Systems 12 Module
N0588 Cut and Joint Sheet Metal (Part 1 of 2 N0647) 12 Module
N0647 Cut and Joint Sheet Metal (Part 2 of 2 N0647) 4 Module
N0557 Design Sanitary Plumbing Systems 20 Module
N0831 Develop Plumbing Skills 16 Module
90350 Electrical Theory 8 Module
N0596 Fabricate and Install Non-ferrous Pressure Piping 8 Module
83386 Fabricate and Install Rain Water Goods (Part 1 of N0643) 16 Module
N0583 Fabricate and Install Rain Water Goods (Part 2 of N0643) 16 Module
N0643 Fabricate and Install Rain Water Goods (Part 3 of N0643) 32 Module
N0556 Fabricate and Install Soil and Waste Stacks 20 Module
83385 Fit Off and Make Final Connections to Hot and Cold Water Systems (Part 1 of N0580) 12 Module
83384 Fit Off and Make Final Connections to Hot and Cold Water Systems (Part 2 of N0580) 10 Module
N0580 Fit Off and Make Final Connections to Hot and Cold Water Systems (Part 3 of N0580) 10 Module
N0584 Flash Penetrations Though Roofs and Walls [Minor roof penetration](Part 1of N0644) 16 Module
N0644 Flash Penetrations Through Roofs and Walls [Major roof penetrations](Part 2 of N0644) 40 Module
N0593 Fusion Welding of PE Pipe 8 Module
N0572 Install and Adjust System Controls and Devices 10 Module
N0558 Install and Fit Off Sanitary Fixture 40 Module
W0001 Install Composite Roof Systems 12 Module
N0567 Install Sanitary Drainage Systems 16 Module
N0564 Install Septic Tanks 12 Module
N0568 Install Stormwater and Sub Soil Drainage Systems 16 Module
83382 Install Water Heating Systems (Part 1of N0574) 12 Module
83381 Install Water Heating Systems (Part 2 of N0574) 16 Module
N0574 Install Water Heating Systems (Part 3 of N0574) 20 Module
83380 LOCATE AND CLEAR BLOCKAGES (Part 1 of N0561) 6 Module
N0561 Locate and Clear Blockages (Part 2 of N0561) 6 Module
N0602 Mark Out Materials 8 Module
N0595 Perform Oxy/lpg Acetylene Cutting 8 Module
M1754 MEM5.4AB Perform routine oxy acetylene welding 18 Unit of competency
N0621 Safe Working On Roofs 16 Module
N0570 Set Out and Install Water Piping Systems 10 Module
N0555 Set Out and Rough in Discharge Pipes and Fixing 16 Module
83383 Undertake Trench Excavation (Part 1 of N0577) 8 Module
N0577 Undertake Trench Excavation (Part 2 of N0577) 10 Module
3.

GAS
These units are mandatory

State Code National Code Title Hours Type
M1193 Basic Combustion, Flueing and Exhaust Principles 3 Module
29058 Gas Installations 2 - Type "A" Appliances 80 Module
M1192 Gas Safety 3 Module
29059 Gas Servicing - Type "A" Appliances 40 Module
M1191 Gas Standards Legislation (Consumer Installations)wa 6 Module
4.

ELECTIVES
Learners to select at least six (6) of the electives listed below.

State Code National Code Title Hours Type
N0603 Assemble Fabricated Components 8 Module
N0591 Connect Irrigation Systems to Drinkable (Potable) Water Supply 12 Module
N0579 Fabricate and Install Fire Hydrant and Hose Reel Systems 12 Module
N0605 Install Air Handling Units 12 Module
N0576 Install and Maintain Water Treatment Equipment 8 Module
N0622 Install Domestic Irrigation Pumps 10 Module
N0560 Install Pre-treatment Facilities 10 Module
N0578 Install Pump Sets 8 Module
N0619 Install Water Service 8 Module
M1755 MEM5.12AB Perform routine manual metal arc welding 18 Unit of competency
N0590 Set Out, Install and Commission Irrigation Systems 16 Module
N0620 Undertake Irrigation System Maintenance 6 Module
5.

CORE
This group for REFERENCE/ARCHIVE PURPOSES ONLY.
The following list of core units do not necessarily specify the order of completion. Training providers, in consultation with the employer/learner, are to identify the most suitable order to complete the core and elective units, depending on the requirements of the institution, workplace, pre-requisites or necessary clustering arrangements to facilitate delivery and assessment.

State Code National Code Title Hours Type
N0648 Apply First Aid in the Workplace (Part 1 of 2 N0608) 15 Module
N0608 Apply First Aid in the Workplace (Part 2 of 2 N0608) 15 Module
N0827 Carry Out Interactive Workplace Communication 16 Module
N0562 BCS3021A Carry Out Levelling 12 Module
N0828 Carry Out OH&S Requirements 16 Module
N0563 BCS3022A Carry Out Simple Forms of Concreting Associated With Plumbing Work 6 Module
N0588 Cut and Joint Sheet Metal (Part 1 of 2 N0647) 12 Module
N0557 Design Sanitary Plumbing Systems 20 Module
N0831 Develop Plumbing Skills 16 Module
N0552 Disconnect Reconnect Services From 'type A' Appliances 6 Module
N0569 Drain/dewater Site - Sumps and Permanent Drainage 10 Module
N0084 BCG1007A Erect and dismantle restricted height scaffolding 16 Unit of competency
N0579 Fabricate and Install Fire Hydrant and Hose Reel Systems 12 Module
N0596 Fabricate and Install Non-ferrous Pressure Piping 8 Module
83386 Fabricate and Install Rain Water Goods (Part 1 of N0643) 16 Module
N0583 Fabricate and Install Rain Water Goods (Part 2 of N0643) 16 Module
N0556 Fabricate and Install Soil and Waste Stacks 20 Module
83385 Fit Off and Make Final Connections to Hot and Cold Water Systems (Part 1 of N0580) 12 Module
83384 Fit Off and Make Final Connections to Hot and Cold Water Systems (Part 2 of N0580) 10 Module
N0580 Fit Off and Make Final Connections to Hot and Cold Water Systems (Part 3 of N0580) 10 Module
N0584 Flash Penetrations Though Roofs and Walls [Minor roof penetration](Part 1of N0644) 16 Module
N0593 Fusion Welding of PE Pipe 8 Module
N0830 Handle Construction Materials and Safe Disposal of Waste 16 Module
N0565 Identify Installation Procedures for On-site Effluent Disposal Systems 12 Module
N0575 Identify Procedure for Collecting and Storing Drinkable (Potable) Water 8 Module
N0548 Install A Type A Applicance Flue 11 Module
N0572 Install and Adjust System Controls and Devices 10 Module
N0558 Install and Fit Off Sanitary Fixture 40 Module
N0576 Install and Maintain Water Treatment Equipment 8 Module
N0539 Install Gas Piping Systems 8 Module
N0547 Install Gas Pressure Regulating Equipment 8 Module
N0586 Install Industrial Roof Components (Part 2 of N0646) 12 Module
N0543 Install Lp Gas Storage of Aggregate Storage Capacity Up to 500l 8 Module
N0560 Install Pre-treatment Facilities 10 Module
N0578 Install Pump Sets 8 Module
N0567 Install Sanitary Drainage Systems 16 Module
N0599 Install Small Bore Heating Systems 10 Module
N0568 Install Stormwater and Sub Soil Drainage Systems 16 Module
N0541 Install Type A Appliances 11 Module
83382 Install Water Heating Systems (Part 1of N0574) 12 Module
83381 Install Water Heating Systems (Part 2 of N0574) 16 Module
N0574 Install Water Heating Systems (Part 3 of N0574) 20 Module
N0619 Install Water Service 8 Module
N0561 Locate and Clear Blockages (Part 2 of N0561) 6 Module
N0602 Mark Out Materials 8 Module
N0090 BCG2007A Operate elevating work platforms (EWP) 8 Unit of competency
N0595 Perform Oxy/lpg Acetylene Cutting 8 Module
M1754 MEM5.4AB Perform routine oxy acetylene welding 18 Unit of competency
N0592 Prepare Basic Irrigation Drawings 10 Module
N0550 Purge Consumer Piping 4 Module
N0829 Read Plans and Calculate Quantities 16 Module
N0621 Safe Working On Roofs 16 Module
N0582 Select and Install Roof and Wall Cladding (Part 2 of 2) 16 Module
N0570 Set Out and Install Water Piping Systems 10 Module
N0555 Set Out and Rough in Discharge Pipes and Fixing 16 Module
N0590 Set Out, Install and Commission Irrigation Systems 16 Module
N0540 Size Consumer Piping Systems for Type A Appliances 12 Module
83383 Undertake Trench Excavation (Part 1 of N0577) 8 Module
N0577 Undertake Trench Excavation (Part 2 of N0577) 10 Module
M1756 MEM5.15AB Weld using manual metal arc welding process 36 Unit of competency
6.

ELECTIVES -
Gas CORE, Plumbing ELECTIVES. THIS GROUP FOR REFERENCE/ARCHIVE PURPOSES ONLY.

State Code National Code Title Hours Type
N0603 Assemble Fabricated Components 8 Module
N0553 Calculate and Install Natural Ventilation for Type A Gas Appliances 8 Module
N0614 Disconnection and Reconnection of Air Distribution Equipment Through Roof or Wall Cladding 8 Module
N0605 Install Air Handling Units 12 Module
N0546 Install Gas Detection Devices 4 Module
N0544 Install Lp Gas Cylinders Aggregate Capacity Exceeding 500 Litres and Less Than 8kl 11 Module
N0545 Install Lp Gas Systems in Caravans and Marine Craft 8 Module
N0606 Install Machine and Plant 12 Module
N0564 Install Septic Tanks 12 Module
N0604 Leak Test Ductwork Systems 6 Module
7.

ELECTIVES - Gas ELECTIVES, Plumbing ELECTIVES. THIS GROUP FOR REFERENCE/ARCHIVE PURPOSES ONLY.

State Code National Code Title Hours Type
N0360 BCF2009A Carry out load slinging of off-site materials 4 Unit of competency
N0591 Connect Irrigation Systems to Drinkable (Potable) Water Supply 12 Module
N0627 Connect Static Storage Tanks 11 Module
N0612 Erect Box Type Louver Units Fixed or Opening 4 Module
N0611 Erect Fixed Continuous Louver Blades 4 Module
N0609 Erect Roof Ventilator Units (Non Mechanical) 8 Module
N0549 Fabricate and Install A 'type B' Appliance Flue 11 Module
N0594 Fabricate and Install Steel Pressure Piping 8 Module
N0601 Install and Insulate Ducting Systems 11 Module
N0632 Install Domestic and Residential Life Safety Sprinkler Systems 11 Module
N0622 Install Domestic Irrigation Pumps 10 Module
N0607 Install Unitary Air Conditioning Equipment 11 Module
N0616 Maintain Mechanical Services Equipment 11 Module
N0551 Maintain 'type A' Appliances 38 Module
N0620 Undertake Irrigation System Maintenance 6 Module
8.

COMPLIMENTARY SKILLS
THIS GROUP FOR REFERENCE/ARCHIVE PURPOSES ONLY.
The following complimentary skills are from the 1411 Certificate III in Roof Plumbing, developed by Midland College of TAFE.

State Code National Code Title Hours Type
N0648 Apply First Aid in the Workplace (Part 1 of 2 N0608) 15 Module
N0647 Cut and Joint Sheet Metal (Part 2 of 2 N0647) 4 Module
N0645 Design Fabricate and Install External Flashings, Metal Ceilings, Associated Softfits and Fascias (Part 1 of Bcs3116a) 4 Module
N0643 Fabricate and Install Rain Water Goods (Part 3 of N0643) 32 Module
N0644 Flash Penetrations Through Roofs and Walls [Major roof penetrations](Part 2 of N0644) 40 Module
N0646 Install Industrial Roof Components (Part 1 of N0586) 4 Module
N0641 Install Roof Coverings to Hyperbolic, Industrial and Barrel (Part 1 of BCS3109a) 9 Module
N0642 Select and Install Roof and Wall Cladding (Part 1 of N0582) 24 Module
Replaces
State Code National Code Title Type
1456 1990 Trade Studies Plumbing & Gasfitting Accredited course
Replaced By
State Code National Code Title Type
1416 51543 Certificate III in General Plumbing and Gas Fitting Accredited course
VET Info Notes
1. This course is the copyright of the Western Australian Department of Training on behalf of the Crown.

2. The proponent for this course is SWAN TAFE on behalf of the WA Department of Training. This course has been accredited by the Training Accreditation Council (TAC) in Western Australia.

3. This course is an interim course to be used for apprentice training in WA pending the endorsement by ANTA (and implementation approval by WADT) of the proposed BCS02 training package qualification BCS30102 Certificate III in Services (General Plumbing). Note: This draft training package has changed since this program was developed. The course has been amended in 2003 to update and to clarify some components.

4. Further information on this program may be obtained from the Manager, Training Products Information Services (TPIS) at the WA Department of Training.

5. This course has been edited by TPIS (QA & R) on 05/02/03 to incorporate changes to competencies as set out in the Plumbing and Services Training Package released by Construction Training Australia (CTA) ITC on the 28/01/03. Futher modification were made on the 24/04/03 to Group 1, 2 and 3. Queries to (08) 9473 6206.
No information
(AP00050) PLUMBING AND GASFITTING Apprenticeship

For elite athletes the minimum hours of employment are 7.5 hours per week, which can be averaged over six month periods.
The elite athlete arrangement is available subject to the requirement of the applicable industrial instrument.