Qualification Outline
22/07/2026 5:26 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate IV in Installation Inspection and Audits
Certificate IV in Installation Inspection and Audits
UEE40311
A134
Replaced
Replaced
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 4.00 | 17/04/2014 | Current | Approved |
Description
Scope
This qualification provides competencies in mandatory and contractual inspections of electrical systems and auditing of entities for compliance with electrical safety requirements. It includes ERAC requirements for an ‘Electrician’s licence’.
Schedule
Packaging Rules
The requirements for granting this qualification will be met when competency is demonstrated and achieved for:- Twenty four (24) core units and
- A combination of elective units to achieve a total weighting of 220 points:
- A maximum of 80 weighting points may be chosen from Group A Imported and Common Elective Units
- A maximum of 110 weighting points may be chosen from Group B Elective Units
- A minimum of 110 to a maximum of 220 weighting points to be chosen from Group C Elective Units
Imported units from other training packages and/or state accredited courses can be added to this group, but they must be selected from qualifications where the unit is first packaged at AQF level 4. If units have not being assigned a weighting by the relevant EE-Oz Industry Technical Advisory Committee, their weighting will be 10 points.
Note:
1. Prerequisite pathways shall be identified and met for all elective units selected.
2. In selecting elective units considerations to career planning advice should be given to units that form part of a prerequisite pathway for the progression to achieve particular competencies or qualification at a higher level.
Note: UEENEEG105A - those holding an 'Unrestricted Electricians Licence' or equivalent issued in an Australian State or Territory meets the requirements of this unit and its pre-requisite requirements
1. Core Units
All twenty four (24) units must be completed
2. Group A Imported and Common Elective Units
Units may be chosen to a maximum of eighty (80) weighting points from Group A.
Please refer to the Training Package for the full list of unit weighting points.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W7740 | UEENEEC010B | Deliver a service to customers | 18 | Unit of competency |
| W7731 | UEENEEC001B | Maintain documentation | 18 | Unit of competency |
| WG730 | HLTAID001 | Provide cardiopulmonary resuscitation | 3 | Unit of competency |
| WC385 | UEENEED101A | Use computer applications relevant to a workplace | 18 | Unit of competency |
| W9434 | CPCCOHS1001A | Work safely in the construction industry | 4 | Unit of competency |
3. Group B Elective Units
Units may be chosen to a maximum of 110 weighting points from Group B.
Please refer to the Training Package for the full list of unit weighting points.
4. Group C Elective Units
A minimum of 110 to a maximum of 220 weighting points to be chosen from Group C.
Please refer to the Training Package for the full list of unit weighting points.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W838 | UEE40310 | Certificate IV in Electrical Installation Inspection and Audits | Qualification |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BFM6 | UEE40320 | Certificate IV in Installation Inspection and Audits | Qualification |
No information
Entry Requirements
Not applicable.