Qualification Outline
22/07/2026 5:16 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate III in Tram or Light Rail Infrastructure
Certificate III in Tram or Light Rail Infrastructure
TLI32913
J538
Replaced
Replaced
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 1.00 | 21/04/2013 | Current | Approved |
Description
Rationale:
This is a general qualification for persons engaged in the tram/light rail infrastructure environment who perform tasks involving a broad range of skilled applications applied in a wide variety of contexts, which may involve application of some discretion and judgment in selecting equipment, services or contingency measures. It may also include responsibility for coordinating the work of others.
Job roles:
The TLI32913 Certificate III in Tram or Light Rail Infrastructure qualification is aligned to the following defined roles:
Tram Infrastructure Track Worker Level 4
Light Rail Track Worker.
Schedule
Packaging Rules
ENTRY REQUIREMENTSThe entry requirements for this qualification are:
- TLI22913 Certificate II in Tram or Light Rail Infrastructure or
- equivalent vocational experience working within the rail infrastructure environment.
PACKAGING RULES
A successful assessment outcome for a total of eleven (11) units of competency comprising:
- six (6) core units, plus
- five (5) elective units from the general elective units list.
Alternatively, up to two (2) units may be drawn with appropriate contextualisation from any currently endorsed national Training Package or accredited course, provided that the unit contributes to the vocational outcome of the qualification.
Where imported units are selected, care must be taken to ensure that all prerequisites specified in the unit are complied with.
1. Core Units
All six (6) units must be completed.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| D5025 | TLIC3003A | Drive medium rigid vehicle | 40 | Unit of competency |
| WG248 | TLIW3042A | Grind rail on tram/light rail systems | 15 | Unit of competency |
| S8339 | TLIW3035A | Heat and cut materials using oxy-LPG equipment for the rail industry | 20 | Unit of competency |
| D5100 | TLIE2008A | Process workplace documentation | 20 | Unit of competency |
| WB068 | RIICCM203A | Read and interpret plans and specifications | 32 | Unit of competency |
| D5099 | TLIE2007A | Use communication systems | 20 | Unit of competency |
2. General Elective Units
Five (5) units may be chosen from the elective units listed.
Please refer to the packaging rules for the full details of available options.
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AWS4 | TLI32915 | Certificate III in Tram or Light Rail Infrastructure | Qualification |
No information
Entry Requirements
The entry requirements for this qualification are:
TLI22913 Certificate II in Tram or Light Rail Infrastructure or
equivalent vocational experience working within the rail infrastructure environment.