Unit of competency Outline
Date retreived
22/07/2026 4:43 AM AWST
22/07/2026 4:43 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Conduct local risk control
Conduct local risk control
Unit of competency
National Code
RIIRIS201D
RIIRIS201D
State Code
WH644
WH644
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
29/05/2014
Field of Education
080317 - Quality Management
Original Release Date
29/05/2014
Nominal Hours
20
Description
This unit describes a participant’s skills and knowledge required to conduct local risk control in the Resources and Infrastructure Industries.This unit is appropriate for those working in operational roles.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare for risk control
- 1.1 Access, interpret and apply risk management documentation and ensure the work activity is compliant
- 1.2 Inspect work area conditions to identify potential hazards
- 1.3 Apply risk management procedures to deal with recognised hazards
- 1.4 Recognise the type and scope of unresolved hazards and their likely impact
2 Assess and identify unacceptable risk
- 2.1 Assess and determine consequence of an event
- 2.2 Consider and determine likelihood of the event
- 2.3 Identify criteria for the acceptability/unacceptability of the risk
- 2.4 Assess risk against criteria to identify if it warrants ‘unacceptable risk’ status and action
- 2.5 Effectively communicate and clarify the decision to others
3 Identify, assess and implement risk treatments
- 3.1 Identify and consider all possible risk treatment options
- 3.2 Identify options by preliminary analysis and consideration of options
- 3.3 Analyse options, including resource requirements
- 3.4 Select most appropriate and effective course of action
- 3.5 Plan and prepare the course of action in detail and acquire/obtain required resources and approval
- 3.6 Implement the approved risk treatment
- 3.7 Review risk management processes
4 Complete records and reports
- 4.1 Effectively communicate accurate information to others on the course of action and implementation
- 4.2 Complete written records and reports for hazards and actions from personal risk assessment
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| D9322 | RIIRIS201B | Conduct local risk control | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCC89 | RIIRIS201E | Conduct local risk control | Unit of competency |