Unit of competency Outline
Date retreived
23/07/2026 7:30 AM AWST
23/07/2026 7:30 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Test, charge and replace batteries and jump-start vehicles
Test, charge and replace batteries and jump-start vehicles
Unit of competency
National Code
AURETR025
AURETR025
State Code
AXD79
AXD79
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
13/07/2016
Field of Education
030505 - Automotive Electrics And Electronics
Original Release Date
13/07/2016
Nominal Hours
20
Description
This unit describes the performance outcomes required to test, charge, replace, retest and secure a range of automotive batteries, including vehicle or machinery jump-starting procedures. It involves preparing for the task, inspecting and testing the battery to determine serviceability, charging, jump-starting, removing and replacing, and undertaking the final retesting of batteries, and completing workplace processes and documentation.It applies to those working in the automotive service and repair industry. The batteries include those in agricultural machinery, heavy commercial vehicles, light vehicles, vessels, motorcycles, mobile plant machinery or outdoor power equipment.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1. Prepare to test, charge and replace batteries and jump-start vehicle
- 1.1 Job requirements are determined according to workplace instructions
- 1.2 Technical information for testing batteries and equipment safe operating procedures are accessed and interpreted from vehicle or machinery and battery manufacturer specifications
- 1.3 Hazards associated with the work are identified and risks are managed
- 1.4 Tools, equipment and materials are selected and checked for serviceability
2. Test battery and determine serviceability
- 2.1 Battery is inspected and tested according to manufacturer specifications, workplace procedures, and safety and environmental requirements
- 2.2 Battery cables, terminals and case are visually inspected to determine faults or damage
- 2.3 Electrolyte levels are checked and topped up as required
- 2.4 Battery and terminals are cleaned using correct equipment and battery cleaning materials
- 2.5 Battery voltage and load are checked to determine if battery requires charging, jump-starting or replacement
3. Charge battery
- 3.1 Technical information for charging is interpreted from vehicle or machinery and battery manufacturer specifications
- 3.2 Tools and equipment for charging battery are identified, selected and prepared according to manufacturer specifications and workplace procedures
- 3.3 Electrolyte levels are checked and topped up as required
- 3.4 Battery charge rate is determined and battery charger is connected to battery according to manufacturer specifications, workplace procedures and safety requirements
- 3.5 Battery is charged according to manufacturer specifications, workplace procedures and safety requirements
- 3.6 Battery charger is turned off and disconnected, and electrolyte levels are rechecked, according to manufacturer specifications, workplace procedures and safety requirements as required
4. Carry out jump-start procedures
- 4.1 Jump-start is carried out according to manufacturer specifications, workplace procedures and safety requirements, and without causing damage to vehicle or machinery
- 4.2 Battery voltage is identified and confirmed as being appropriate to jump-start procedures and vehicle or machinery
- 4.3 Leads are connected and disconnected in correct sequence and polarity according to manufacturer specifications, workplace procedures and safety requirements
5. Remove and replace battery
- 5.1 Appropriate power source memory back-up device is connected to ensure no loss of power to accessories as required
- 5.2 Battery terminals are disconnected according to manufacturer specifications, workplace procedures and safety requirements
- 5.3 Battery is removed from vehicle according to manufacturer specifications, workplace procedures and safety requirements
- 5.4 Replacement battery is chosen appropriate to electrical and physical specifications and measurements of vehicle or machinery
- 5.5 Battery is replaced and secured according to manufacturer specifications, workplace procedures and safety requirements
- 5.6 Battery terminals are reconnected and tightened according to manufacturer specifications, workplace procedures and safety requirements
- 5.7 Post-replacement testingis carried out to confirm battery charging system is operating to manufacturer specifications, any reported problems are resolved, and no other problems are present
6. Complete work processes
- 6.1 Final inspection is made to ensure work is to workplace expectations and vehicle, vessel or machinery is presented ready for use
- 6.2 Work area is cleaned, waste and non-recyclable materials are disposed of, and recycled material is collected
- 6.3 Tools and equipment are checked and stored and any faulty electrical equipment is identified, tagged and isolated according to workplace procedures
- 6.4 Workplace documentation is processed according to workplace procedures
No information
No information
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WF107 | AURETR3025 | Test, charge and replace batteries | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| OCK04 | AURETR125 | Test, charge and replace batteries and jump-start vehicles | Unit of competency |