Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Roof Plumbing (Pre-Apprenticeship)
Roof Plumbing (Pre-Apprenticeship)
Pathway
National Code
—
—
State Code
WB70
WB70
DTWD Status
Replaced
Replaced
National Endorsed, State Implementation and Classification
Original TGA Release Date
07/02/2013
07/02/2013
Field of Education
0403 - Building
0403 - Building
Approved Date
28/03/2013
28/03/2013
Stream of Study
Initial Vocational (3100 - 3600)
Initial Vocational (3100 - 3600)
Duration
1 Semester
Current Release Version
2.00
2.00
Current Release Date
07/08/2019
07/08/2019
Nominal Hours
600
600
Description
This is a training program that leads to the completion of the Roof Plumbing (Pre-Apprenticeship) pathway and the Construction, Plumbing and Services Training Package qualification CPC20812 Certificate II in Metal Roofing and Cladding.
Packaging Rules
1. Core Units
All fifteen (15) units must be completed
2. Elective Units
Select nine (9) units of competency according to the packaging rules for qualification CPC20812 Certificate II in Metal Roofing and Cladding from the CPC08 Construction, Plumbing and Services Training Package.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W9435 | CPCCOHS2001A | Apply OHS requirements, policies and procedures in the construction industry | 32 | Unit of competency |
| W9378 | CPCCCM2009A | Carry out basic demolition | 16 | Unit of competency |
| W9555 | CPCCST2005A | Carry out load slinging of off-site materials | 4 | Unit of competency |
| WF842 | CPCPCM2054A | Carry out simple concreting and rendering | 24 | Unit of competency |
| WF948 | CPCPRF2023A | Collect and store roof water | 24 | Unit of competency |
| WF838 | CPCPCM2049A | Cut using oxy-LPG-acetylene equipment | 8 | Unit of competency |
| WE986 | CPCCCM2008B | Erect and dismantle restricted height scaffolding | 16 | Unit of competency |
| WF841 | CPCPCM2053A | Weld using manual metal arc welding equipment | 8 | Unit of competency |
| WF840 | CPCPCM2052A | Weld using oxy-acetylene equipment | 8 | Unit of competency |
3. Supervised Skills and Work Placement
Units below are available for the development of Employability Skills and supervised skills practice.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| Y0303 | Y0303 | Supervised Skills Practice 1 | 40 | Module |
| Y0300 | Supervised Skills Practice 2 | 40 | Module | |
| Y0315 | Supervised Skills Practice 3 | 40 | Module | |
| Y0281 | Work Placement 1 | 40 | Module | |
| Y0282 | Work Placement 2 | 40 | Module | |
| Y0283 | Work Placement 3 | 40 | Module |
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| WB47 | Pre-Apprenticeship - Roof Plumbing | Pathway |
Note
1. This training program represents a pathway of the qualification code CPC20812 taken from version 8 of the CPC08 Construction, Plumbing and Services Training Package, which should be consulted for a full description of requirements.
2. The pathway outline is provided by Polytechnic West. Further information may be obtained from Murray Warren, Phone: 9442 8313, Email: murray.warren@polytechnic.wa.edu.au
3. Details were entered on to STARS on 19/06/2013.
2. The pathway outline is provided by Polytechnic West. Further information may be obtained from Murray Warren, Phone: 9442 8313, Email: murray.warren@polytechnic.wa.edu.au
3. Details were entered on to STARS on 19/06/2013.
Entry Requirements
Not applicable.