Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Facilitate a Just in Time system
Facilitate a Just in Time system
Unit of competency
National Code
MSS403021A
MSS403021A
State Code
WD521
WD521
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
24/10/2014
Field of Education
080317 - Quality Management
Original Release Date
24/10/2014
Nominal Hours
50
Description
This unit of competency covers skills and knowledge required to facilitate the implementation/operation of a Just in Time (JIT)/kanban system in a team or work area.
Notes
Elements and Performance Criteria
1 Monitor the operation of the JIT system
- 1.1 Track value of key measures
- 1.2 Recognise indicators of poor performance
- 1.3 Take appropriate quick fix action
2 Liaise with relevant stakeholders
- 2.1 Regularly communicate with team or work group members regarding the operation of the JIT system
- 2.2 Review JIT key performance indicators (KPIs) with team or work group members
- 2.3 Communicate with relevant personnel up and down the value stream regarding the operation of the JIT system
- 2.4 Identify issues with stakeholders and take appropriate quick fix action
3 Improve the JIT system
- 3.1 Identify areas requiring improvement in the JIT system
- 3.2 Identify root cause of JIT-related problems
- 3.3 Review value of key measures
- 3.4 Recognise skill gaps in team members and other stakeholders
- 3.5 Determine any other issues in team or work group, other stakeholders and JIT system leading to poor performance indicators
- 3.6 Develop appropriate improvement solutions
- 3.7 Liaise with relevant people regarding improvement solutions
- 3.8 Implement and/or assist with the implementation of the solutions
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
JIT, kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
JIT
JIT refers to:
a production scheduling concept that calls for any item needed at a production operation (whether raw material, finished item, or anything in between) to be produced and available precisely when needed, neither a moment earlier nor a moment later
Kanban
Kanban is a card or sheet used to authorise production or movement of an item; when fully implemented, kanban operates according to the following rules:
all production and movement of parts and material take place only as required by a downstream operation (i.e. all operations and procurement are ultimately driven by the requirements of final assembly or the equivalent)
the specific tool which authorises production or movement is called a kanban. The word literally means card or sign, but it can legitimately refer to a container or other authorising device. Kanban have various formats and content as appropriate for their usage (e.g. a kanban for a vendor is different than a kanban for an internal machining operation)
Kanban is typically applied to batch type operation and the production is measured in units produced. In continuous processing organisations, production is measured in terms of production rate (e.g. kg/h, tonne/day) and rate is increased/decreased according to the flow authorisation which may be a kanban (e.g. ticket, order from a supplier) or may be a SCADA signal from a remote facility (e.g. customer tank) saying that resupply is required or similar
SCADA
SCADA refers to:
a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information to personnel for action
Key measures
Key measures may include:
inventory levels
lead time
In Full, On Time and In Specification (IFOTIS) delivery
productivity/production rate
other measures of pull through the value stream
quality
Quick fix
Quick fix refers to:
action taken to immediately and cheaply control a problem, prevent it getting worse and/or ameliorate its impact, but which does not necessarily solve it long term
Pull system
Pull refers to:
a system of making to demand rather than for stock or to a forecast
Value stream
The value stream begins with the customer and includes all actions (both value-adding and non-value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement, stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
Competitive systems and practices
Competitive systems and practices may include, but are not limited to:
lean operations
agile operations
preventative and predictive maintenance approaches
monitoring and data gathering systems, such as Systems Control and Data Acquisition (SCADA) software, Enterprise Resource Planning (ERP) systems, Materials Resource Planning (MRP) and proprietary systems
statistical process control systems, including six sigma and three sigma
JIT, kanban and other pull-related operations control systems
supply, value, and demand chain monitoring and analysis
5S
continuous improvement (kaizen)
breakthrough improvement (kaizen blitz)
cause/effect diagrams
overall equipment effectiveness (OEE)
takt time
process mapping
problem solving
run charts
standard procedures
current reality tree
Competitive systems and practices should be interpreted so as to take into account:
the stage of implementation of competitive systems and practices
the size of the enterprise
the work organisation, culture, regulatory environment and the industry sector
JIT
JIT refers to:
a production scheduling concept that calls for any item needed at a production operation (whether raw material, finished item, or anything in between) to be produced and available precisely when needed, neither a moment earlier nor a moment later
Kanban
Kanban is a card or sheet used to authorise production or movement of an item; when fully implemented, kanban operates according to the following rules:
all production and movement of parts and material take place only as required by a downstream operation (i.e. all operations and procurement are ultimately driven by the requirements of final assembly or the equivalent)
the specific tool which authorises production or movement is called a kanban. The word literally means card or sign, but it can legitimately refer to a container or other authorising device. Kanban have various formats and content as appropriate for their usage (e.g. a kanban for a vendor is different than a kanban for an internal machining operation)
Kanban is typically applied to batch type operation and the production is measured in units produced. In continuous processing organisations, production is measured in terms of production rate (e.g. kg/h, tonne/day) and rate is increased/decreased according to the flow authorisation which may be a kanban (e.g. ticket, order from a supplier) or may be a SCADA signal from a remote facility (e.g. customer tank) saying that resupply is required or similar
SCADA
SCADA refers to:
a number of systems which automatically collect critical process data, perform required mathematical manipulations on it and then make control decisions and/or give required information to personnel for action
Key measures
Key measures may include:
inventory levels
lead time
In Full, On Time and In Specification (IFOTIS) delivery
productivity/production rate
other measures of pull through the value stream
quality
Quick fix
Quick fix refers to:
action taken to immediately and cheaply control a problem, prevent it getting worse and/or ameliorate its impact, but which does not necessarily solve it long term
Pull system
Pull refers to:
a system of making to demand rather than for stock or to a forecast
Value stream
The value stream begins with the customer and includes all actions (both value-adding and non-value added) by both internal sections/departments and external organisations to meet a customer requirement.
Depending on the operations and the customer requirement, stages where value stream actions may occur include:
sales outlet/representative
information gathering, data analysis and research
product design
raw material sourcing
intermediate processing
final assembler/collation/preparation
support services (e.g. accounting, finance and legal)
storage and delivery to customer
after market support
The evidence guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Evidence should be available of the person's facilitation of the operation of the JIT system and their making of recommendations for/making improvements.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
identify the JIT system and practices used in their team or area of responsibility
identify and monitor JIT key measures
solve JIT-related problems to root cause
implement and monitor JIT-related changes to operations and practices.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Overview of assessment
Evidence should be available of the person's facilitation of the operation of the JIT system and their making of recommendations for/making improvements.
Critical aspects for assessment and evidence required to demonstrate competency in this unit
A person who demonstrates competency in this unit must be able to provide evidence of the ability to:
identify the JIT system and practices used in their team or area of responsibility
identify and monitor JIT key measures
solve JIT-related problems to root cause
implement and monitor JIT-related changes to operations and practices.
Context of and specific resources for assessment
Assessment of performance must be undertaken in a workplace using or implementing one or more competitive systems and practices.
Access may be required to:
workplace procedures and plans relevant to work area
specifications and documentation relating to planned, currently being implemented, or implemented changes to work processes and procedures relevant to the assessee
documentation and information in relation to production, waste, overheads and hazard control/management
reports from supervisors/managers
case studies and scenarios to assess responses to contingencies.
Method of assessment
A holistic approach should be taken to the assessment.
Competence in this unit may be assessed by using a combination of the following to generate evidence:
demonstration in the workplace
workplace projects
suitable simulation
case studies/scenarios (particularly for assessment of contingencies, improvement scenarios, and so on)
targeted questioning
reports from supervisors, peers and colleagues (third-party reports)
portfolio of evidence.
In all cases it is expected that practical assessment will be combined with targeted questioning to assess underpinning knowledge.
Where applicable, reasonable adjustment must be made to work environments and training situations to accommodate ethnicity, age, gender, demographics and disability.
Guidance information for assessment
Assessment processes and techniques must be culturally appropriate and appropriate to the oracy, language and literacy capacity of the candidate and the work being performed.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| W8998 | MSACMT421A | Facilitate a Just in Time (JIT) system | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BAK30 | MSS403021 | Facilitate a Just in Time system | Unit of competency |