Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Carry out concreting to simple forms
Carry out concreting to simple forms
Unit of competency
National Code
CPCCCO2013
CPCCCO2013
State Code
OCQ96
OCQ96
TGA Status
Current
Current
DTWD Status
Approved
Approved
State Implementation and Classification
Approved Date
01/06/2021
Field of Education
040399 - Building, N.e.c.
Original Release Date
01/06/2021
Nominal Hours
24
Description
This unit of competency specifies the skills and knowledge required to safely install formwork, reinforcement and place and finish concrete for the construction of minor slabs, pathways and other minor works to a specified design finish, meeting all relevant requirements of the National Construction Code (NCC), Australian Standards, work health and safety (WHS), and Commonwealth and state or territory legislation. The unit is suitable for those with basic skills and knowledge undertaking routine work tasks under the direction of more experienced workers.Completion of the general construction induction training program specified by the model Code of Practice for Construction Work is required for any person who is to carry out construction work. Achievement of CPCWHS1001Prepare to work safely in the construction industry meets this requirement.No licensing, legislative or certification requirements apply to this unit at the time of publication.
Notes
Elements and Performance Criteria
1 Plan and prepare.
- 1.1 Read and interpret work instructions and plan sequence of work.
- 1.2 Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
- 1.3 Select tools and equipment, check for serviceability and report any faults.
- 1.4 Select and use personal protective equipment (PPE) for each part of the task.
- 1.5 Inspect work site, locate services, assess hazards and apply risk controls, including required signage and barricades.
- 1.6 Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Erect simple formwork.
- 2.1 Prepare substrate.
- 2.2 Review formwork design from drawings.
- 2.3 Erect formwork.
- 2.4 Install vapour barrier.
3 Place and tie reinforcement.
- 3.1 Handle, cut and position reinforcing components.
- 3.2 Position reinforcing bars and mesh.
- 3.3 Position bar chairs and spacers with minimum edge cover.
4 Place concrete.
- 4.1 Clean formwork or excavation of excess material and debris before concrete placement.
- 4.2 Transport concrete by wheelbarrow.
- 4.3 Place concrete in formwork to specified depth.
- 4.4 Screed concrete to the alignment of formwork and specified datums.
- 4.5 Finish surface of concrete to specifications.
5 Strip simple formwork.
- 5.1 Denail timber components following stripping of formwork.
- 5.2 Clean and stack components and store for reuse or bundle for removal.
- 5.3 Remove formwork components from site.
6 Clean up.
- 6.1 Clean up, meeting all legislative and workplace requirements for safety, waste disposal, materials handling and protection of the environment.
- 6.2 Check, maintain and store tools and equipment and report any faults.