Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Certificate II in Telecommunications Network Build and Operate
Certificate II in Telecommunications Network Build and Operate
ICT20215
AZH9
Replaced
Transition (Replaced)
National Endorsed, State Implementation and Classification
Releases
| Release Version | Release Date | TGA Status | DTWD Status |
|---|---|---|---|
| 3.00 | 13/09/2016 | Current | Transition (Replaced) |
| 2.00 | 18/01/2016 | Replaced | Approved |
| 1.00 | 14/01/2016 | Replaced | Approved |
Description
This qualification has been designed as a pathway for entry into work on the National Broadband Network (NBN).
This qualification provides individuals with the skills and knowledge in a range of NBN industry occupations, specifically for the national rollout of high speed broadband network infrastructure. This may be undertaken as part of a traineeship.
In conjunction with safe working practices, the Telecommunications Linesworker occupational outcome is achieved by selecting one of three specialist technology streams: Fibre or Copper or Hybrid Fibre Coaxial (HFC).
The Linesworker occupation reflects the role of operators who perform cable and infrastructure work underground. This involves safe civil and construction work in site preparation, building of enclosures, installing mounting brackets and hauling of underground cables. It also reflects the role of operators in performing work safely aboveground to install fibre or metallic aerial cable and infrastructure. This may also include installation of aerial lead-in cables to customer premises and providing traffic management.
Licensing/Regulatory Information
Work functions in the occupational areas where this qualification may be used may be subject to regulatory requirements. Refer to the ICT Implementation Guide Companion Volume or the relevant regulator for details of licensing, legislative or certification requirements.
Cabling at the customer premises must be carried out according to requirements of the Australian Communications and Media Authority (ACMA) and relevant industry registration bodies, and in line with the specifications of the access network owner. Refer to "Pathways to ACMA Cabling Provider Rules - Cabling registration" and the mandatory industry practical hours required for registration.
Schedule
Packaging Rules
Total number of units = twelve (12)- five (5) core units plus
- seven (7) elective units
The elective units consist of
- up to seven (7) from Group A or Group B
- up to two (2) may be from elsewhere in this Training Package, another currently endorsed Training Package or any accredited course at AQF level II or III.
Elective units must be relevant to the work environment and the qualification, maintain the integrity of the Australian Qualification Framework (AQF) alignment and contribute to a valid, industry-supported vocational outcome. This could be achieved by selecting a specialisation (see below) or by selecting an appropriate mix of electives from both Group A and B.
Units selected from other training packages or accredited courses must not duplicate units selected from, or available within, the ICT Information and Communications Technology Training Package.
Refer to the Specialisations information below, and to the Companion Volume Implementation Guide, for advice about choosing electives to support specialisations.
Telecommunications Linesworker Fibre
The following seven (7) units must be selected:
- ICTCBL211 Install an above ground equipment enclosure
- ICTCBL213 Construct underground telecommunications infrastructure
- ICTCBL214 Fix aerial cable
- ICTCBL207 Haul underground cable
- ICTPMG201 Prepare site for support installation
- ICTTEN310 Remove and replace electronic circuit boards in carrier equipment
- ICTTEN311 Inspect, clean and handle optical fibre cable and connectors.
Telecommunications Linesworker Copper
The following six (6) units must be selected:
- ICTCBL211 Install an above ground equipment enclosure
- ICTCBL213 Construct underground telecommunications infrastructure
- ICTCBL214 Fix aerial cable
- ICTCBL207 Haul underground cable
- ICTCBL320 Jumper metallic conductor cable in the access network
- ICTPMG201 Prepare site for support installation.
Telecommunications Linesworker HFC
The following six (6) units must be selected:
- ICTCBL209 Joint and terminate coaxial cable
- ICTCBL211 Install an above ground equipment enclosure
- ICTCBL214 Fix aerial cable
- ICTCBL220 Install a cable lead-in
- ICTBWN305 Use optical and radio frequency measuring instruments
- ICTPMG201 Prepare site for support installation
Plus:
- ICTWHS201 Provide telecommunications services safely on roofs
or
- RIIWHS204D Work safely at heights.
1. Core Units
All five (5) units must be completed.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| AWC80 | ICTWHS204 | Follow work health and safety and environmental policy and procedures | 35 | Unit of competency |
| AWD63 | ICTTEN201 | Use electrical skills in telecommunications work | 35 | Unit of competency |
| AWG35 | ICTTEN202 | Use hand and power tools | 40 | Unit of competency |
| AWC79 | ICTWOR201 | Work effectively in telecommunications technology | 40 | Unit of competency |
| W9434 | CPCCOHS1001A | Work safely in the construction industry | 4 | Unit of competency |
2. Group A Elective Units - Cabling
Up to seven (7) may be completed from either Group A or Group B.
Please refer to the packaging rules for the full list of available options.
3. Group B Elective Units - General
Up to seven (7) may be completed from either Group A or Group B.
Please refer to the packaging rules for the full list of available options.
| State Code | National Code | Title | Hours | Type |
|---|---|---|---|---|
| W9435 | CPCCOHS2001A | Apply OHS requirements, policies and procedures in the construction industry | 32 | Unit of competency |
| WF833 | CPCPCM2043A | Carry out WHS requirements | 34 | Unit of competency |
| AWD58 | ICTTEN207 | Install and test internet protocol devices in convergence networks | 45 | Unit of competency |
| AUK77 | BSBSUS201 | Participate in environmentally sustainable work practices | 10 | Unit of competency |
| WG730 | HLTAID001 | Provide cardiopulmonary resuscitation | 3 | Unit of competency |
| WG732 | HLTAID003 | Provide first aid | 20 | Unit of competency |
| AWC83 | ICTWHS201 | Provide telecommunications services safely on roofs | 45 | Unit of competency |
| D9382 | CPCCDE3014A | Remove non-friable asbestos | 25 | Unit of competency |
| WE985 | CPCCCM2007B | Use explosive power tools | 8 | Unit of competency |
| WH753 | RIIWHS204D | Work safely at heights | 16 | Unit of competency |
| AWC81 | ICTWHS203 | Work safely near power infrastructure | 30 | Unit of competency |
| WF843 | CPCPCM2055A | Work safely on roofs | 15 | Unit of competency |
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| J600 | ICT20613 | Certificate II in National Broadband Network Construction | Qualification |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| BER0 | ICT20219 | Certificate II in Telecommunications Network Build and Operation | Qualification |
No information
Entry Requirements
Nil.