Unit of competency Outline
Date retreived
22/07/2026 7:19 AM AWST
22/07/2026 7:19 AM AWST
Whilst all efforts are made to provide accurate and timely information from the relevant source/documentation, please be aware that the information supplied may not be the most current version. The accuracy of the detail has not been confirmed by the Department and therefore should not be relied upon without first confirming the contents.
Identify risk and apply risk management processes
Identify risk and apply risk management processes
Unit of competency
National Code
BSBRSK401A
BSBRSK401A
State Code
D0995
D0995
TGA Status
Replaced
Replaced
DTWD Status
Replaced
Replaced
State Implementation and Classification
Approved Date
05/11/2014
Field of Education
080301 - Business Management
Original Release Date
05/11/2014
Nominal Hours
40
Description
This unit describes the performance outcomes, skills and knowledge required to identify risks and to apply established risk management processes to a subset of an organisation or project's operations that are within the person's own work responsibilities and area of operation.No licensing, legislative, regulatory or certification requirements apply to this unit at the time of endorsement.
Notes
Elements and Performance Criteria
1. Identify risks
- 1.1. Identify the context for risk management
- 1.2. Identify risks using tools, ensuring all reasonable steps have been taken to identify all risks
- 1.3. Document identified risks in accordance with relevant policies, procedures and legislation
2. Analyse and evaluate risks
- 2.1. Analyse and document risks in consultation with relevant stakeholders
- 2.2. Undertake risk categorisation and determine level of risk
- 2.3. Document analysis processes and outcomes
3. Treat risks
- 3.1. Determine appropriate control measures for risks and assess for strengths and weaknesses
- 3.2. Identify control measures for all risks
- 3.3. Refer risks relevant to whole of organisation or having an impact beyond own work responsibilities and area of operation to others as per established policies and procedures
- 3.4. Choose and implement control measures for own area of operation and/or responsibilities
- 3.5. Prepare and implement treatment plans
4. Monitor and review effectiveness of risk treatment/s
- 4.1. Regularly review implemented treatment/s against measures of success
- 4.2. Use review results to improve the treatment of risks
- 4.3. Provide assistance to auditing risk in own area of operation
- 4.4. Monitor and review management of risk in own area of operation
RANGE STATEMENT
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Context may include:
any related projects or organisations
any resources, including physical assets, which are vital to operations
key operational elements and service of the organisation
organisation or project, how it is organised and its capabilities
own role and responsibilities in relation to overall project or organisation design
Risks may include:
commercial and legal relationships
economic circumstances and scenarios
human behaviour
individual activities
management activities and controls
natural events
political circumstances
positive risk
technology - technological issues
Tools may include:
documentation to assist in process of identifying risk, and assessing impact and likelihood of occurrence
standard instruments developed for the organisation and contextualised for sections of the workplace's operations, such as checklists and testing procedures
tools to prioritise risks, including where relevant, numerical scoring systems for risks
Stakeholders may include:
contractors
employees
financial managers
insurance agents
managers
public
service providers
suppliers
unions
volunteers
Risk categorisation may include:
likelihood of risks:
almost certain
likely
possible
unlikely
rare
consequences of risks:
insignificant
minor
moderate
major
catastrophic
current control measures
Level of risk may include:
low, treated with routine procedures
moderate, with specific responsibility allocated for the risk, and monitoring and response procedures implemented
high, requiring action, as it has potential to be damaging to the organisation or project
extreme, requiring immediate action, as it has potential to be devastating to the organisation or project
Control measures may include:
hierarchy of controls:
reduction in likelihood of risks
reduction of consequences of risks
retention of risks
risk aversion
transfer of responsibility of risks
Measures of success may include:
costs
reductions in impact
reductions in likelihood
reductions in occurrence
The range statement relates to the unit of competency as a whole. It allows for different work environments and situations that may affect performance. Bold italicised wording, if used in the performance criteria, is detailed below. Essential operating conditions that may be present with training and assessment (depending on the work situation, needs of the candidate, accessibility of the item, and local industry and regional contexts) may also be included.
Context may include:
any related projects or organisations
any resources, including physical assets, which are vital to operations
key operational elements and service of the organisation
organisation or project, how it is organised and its capabilities
own role and responsibilities in relation to overall project or organisation design
Risks may include:
commercial and legal relationships
economic circumstances and scenarios
human behaviour
individual activities
management activities and controls
natural events
political circumstances
positive risk
technology - technological issues
Tools may include:
documentation to assist in process of identifying risk, and assessing impact and likelihood of occurrence
standard instruments developed for the organisation and contextualised for sections of the workplace's operations, such as checklists and testing procedures
tools to prioritise risks, including where relevant, numerical scoring systems for risks
Stakeholders may include:
contractors
employees
financial managers
insurance agents
managers
public
service providers
suppliers
unions
volunteers
Risk categorisation may include:
likelihood of risks:
almost certain
likely
possible
unlikely
rare
consequences of risks:
insignificant
minor
moderate
major
catastrophic
current control measures
Level of risk may include:
low, treated with routine procedures
moderate, with specific responsibility allocated for the risk, and monitoring and response procedures implemented
high, requiring action, as it has potential to be damaging to the organisation or project
extreme, requiring immediate action, as it has potential to be devastating to the organisation or project
Control measures may include:
hierarchy of controls:
reduction in likelihood of risks
reduction of consequences of risks
retention of risks
risk aversion
transfer of responsibility of risks
Measures of success may include:
costs
reductions in impact
reductions in likelihood
reductions in occurrence
EVIDENCE GUIDE
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the following is essential:
identification, analysis and evaluation of risks
demonstrated understanding of personal role in relation to wider organisational or project context
demonstrated understanding of risk management processes and procedures.
Context of and specific resources for assessment
Assessment must ensure:
access to workplace documentation relating to risk management
access to risk management tools and frameworks.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate
review of documentation outlining risk analysis processes and outcomes
analysis of responses to case studies and scenarios
oral or written questioning to assess knowledge of Australian and international standards for risk management
review of implementation of treatment plans.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
general administration units
other risk management units.
The Evidence Guide provides advice on assessment and must be read in conjunction with the performance criteria, required skills and knowledge, range statement and the Assessment Guidelines for the Training Package.
Overview of assessment
Critical aspects for assessment and evidence required to demonstrate competency in this unit
Evidence of the following is essential:
identification, analysis and evaluation of risks
demonstrated understanding of personal role in relation to wider organisational or project context
demonstrated understanding of risk management processes and procedures.
Context of and specific resources for assessment
Assessment must ensure:
access to workplace documentation relating to risk management
access to risk management tools and frameworks.
Method of assessment
A range of assessment methods should be used to assess practical skills and knowledge. The following examples are appropriate for this unit:
direct questioning combined with review of portfolios of evidence and third party workplace reports of on-the-job performance by the candidate
review of documentation outlining risk analysis processes and outcomes
analysis of responses to case studies and scenarios
oral or written questioning to assess knowledge of Australian and international standards for risk management
review of implementation of treatment plans.
Guidance information for assessment
Holistic assessment with other units relevant to the industry sector, workplace and job role is recommended, for example:
general administration units
other risk management units.
Replaces
| State Code | National Code | Title | Type |
|---|---|---|---|
| C6984 | BSBCMN416A | Identify risk and apply risk management processes | Unit of competency |
Replaced By
| State Code | National Code | Title | Type |
|---|---|---|---|
| AUI64 | BSBRSK401 | Identify risk and apply risk management processes | Unit of competency |